Maharashtra<br />

Particulars Arrears No. <strong>of</strong> days<br />

PD and others 2596.34<br />

Mula Prawara Society 656.00<br />

Inter State 115.00<br />

Total 9042.95<br />

* HT – Industrial and Railways. Includes – HTP-I, HTP-II, HTP-V, HTP-VI<br />

** PWW includes – LT PWW, HTP-III, HTP-IV<br />

*** Agriculture includes LT Agri., LT Poultry, HTP-VII, SP-I<br />

It appears that it would be difficult to recover a large portion <strong>of</strong> these arrears. During<br />

discussions, a view was expressed that on account <strong>of</strong> large scale load shedding there<br />

are practical limitations in organising a crash programme to recover arrears.<br />

Aggregate Technical and Commercial Losses<br />

The position in respect <strong>of</strong> AT&C losses is given as under:<br />

2001-<br />

02<br />

2002-<br />

03<br />

Table: Year-wise AT&C losses (%)<br />

2003-<br />

04<br />

2004-<br />

05<br />

10.47<br />

2005-<br />

06<br />

2006-<br />

07<br />

2007-<br />

08<br />

2008-<br />

09<br />

45.7 45.27 44.18 35.97 36.06 31.0 26.7 22.2<br />

MSEDCL has reported that the following measures has been undertaken by it for<br />

reducing AT&C and other losses:<br />

i) Replacement <strong>of</strong> faulty meters;<br />

ii) Erection <strong>of</strong> additional lines/transformers/substations;<br />

iii) Check on theft <strong>of</strong> energy through 36 flying squads; and<br />

iv) As in November 2005, 52,923 DTs were provided with meters. Energy<br />

accounting in respect <strong>of</strong> 47,918 transformers was carried out. Out <strong>of</strong> these, 46<br />

per cent transformers have registered less than 25 per cent AT&C losses.<br />

Steps to further reduce losses include installation <strong>of</strong> meters on all DTs,<br />

implementation <strong>of</strong> High Voltage Distribution System (HVDS) to improve HT/LT<br />

ratio, capacity additions to install additional lines/sub-stations/transformers, etc.<br />

Preventive Action and Prosecution for Theft <strong>of</strong> Electricity<br />

The following table gives details <strong>of</strong> raids carried out, demand raised and prosecution<br />

cases registered in respect <strong>of</strong> cases <strong>of</strong> theft <strong>of</strong> electricity.