State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

5.44<br />

ANNEXURE-III<br />

OERC’S ASSESSMENT OF TECHNICAL AND COMMERCIAL<br />

PERFORMANCE OF THE DISCOMs<br />

(AS ON 30 SEPTEMBER 2005)<br />

CESCO NESCO WESCO SOUTHCO TOTAL<br />

METERING POSITION<br />

No. <strong>of</strong> meters 8,98,091 4,39,071 4,39,548 4,57,232 22,33,942<br />

No. <strong>of</strong> working meters 7,99,431 3,37,306 4,25,549 4,41,772 20,04,058<br />

Percentage <strong>of</strong> working<br />

89 77 97 97 90<br />

meters (%)<br />

No. <strong>of</strong> defective meters 98,660 96,797 13,999 15,460 2,24,916<br />

No. <strong>of</strong> disconnection made 870 61,159 41,083 1,03,112<br />

Revenue realised<br />

3.95 1.92 5.87<br />

(Rs crore)<br />

New meters installed (3PH) 189 127 570 886<br />

No. <strong>of</strong> meters installed (1 Ph) 22,299 15,274 5,011 18,078 60,662<br />

No. <strong>of</strong> EHT meters tested 29 6 1 32 68<br />

No. <strong>of</strong> HT meters tested 523 320 246 548 1637<br />

Interruptions <strong>of</strong> 33 kV<br />

feeders (from grid S/S)<br />

1,009 8,872 8,352 8,787 27,020<br />

Interrupts <strong>of</strong> 11 kV feeders<br />

(from 33 /11 kV S/S)<br />

1,787 22,862 47,377 70,733 1,42,759<br />

No. <strong>of</strong> power transformers<br />

20 19 15 7 61<br />

failed<br />

No. <strong>of</strong> distribution burnt 1,171 1,058 230 378 2837<br />

Cost involved (crore) 2.46 1.17 0.21 0.25 4.79<br />

Length <strong>of</strong> conductors stolen<br />

43.00 51.82 34.75 48.15 177.72<br />

(ckt km)<br />

Cost involved (crore) 0.047 0.051 0.050 0.050 0.198<br />

No. <strong>of</strong> grievances received 630 765 11,979 8,745 22,119<br />

Disposed through CHP<br />

including Bijli Adalat<br />

630 711 10,801 6,775 18,917<br />

No. <strong>of</strong> hooks detected 20,524 11,920 3,294 35,738<br />

No. <strong>of</strong> hooks repeated out <strong>of</strong><br />

hooks detected<br />

3658 932 4,590<br />

No. <strong>of</strong> connections<br />

1,618 1,554 11,814 1,853 16,839<br />

regularised<br />

Amount billed (crore) 2.14 0.56 0.57 3.27<br />

Amount collected (crore) 1.19 0.41 0.20 1.80<br />

No. <strong>of</strong> FIRs lodged 65 65