04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

SUPPLEMENTARY INFORMATION ABOUT GENERATION/<br />

TRANSMISSION/DISTRIBUTION COMPANIES<br />

GUJARAT STATE ELECTRICITY CORPORATION LIMITED (GSECL)<br />

Present Installed Capacity/energy generated/performance<br />

Out <strong>of</strong> the total generating capacity <strong>of</strong> 8,974 MW in Gujarat, GSECL has an installed<br />

capacity <strong>of</strong> 4,968 MW, private sector capacity is 2,166 MW and the State’s share in<br />

central sector plants is 1,840 MW. GSECL’s capacity comprises <strong>of</strong> 4,179 MW<br />

thermal, 547 MW hydro and 242 MW gas based plants.<br />

The tables below give the details <strong>of</strong> capacity, energy generated and performance<br />

parameters:<br />

Installed Capacity (MW)<br />

Particulars<br />

2000<br />

-01<br />

2001<br />

-02<br />

2002<br />

-03<br />

2003<br />

-04<br />

2004<br />

-05<br />

2005<br />

-06<br />

Hydel 547 547 547 547 547 547<br />

Thermal 4179 4179 4179 4179 4179 4179<br />

Gas 234 201* 162** 269*** 269 242****<br />

Total 4960 4927 4888 4995 4995 4968<br />

* Dhuvaran 27 MW Gas Turbine and 6 MW <strong>of</strong> Utran old capacity derated.<br />

** Utran Old 39 MW derated.<br />

*** Dhuvaran –I 107 MW capacity added.<br />

**** Dhuvaran old 27 MW capacity derated.<br />

Energy Generated (MU)<br />

Particulars 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06<br />

Hydel 436 287 588 859 832 795<br />

Thermal 24922 24970 25450 23800 25280 24525<br />

Gas 854 819 888 934 1876 1810<br />

Total 26212 26076 26926 25593 27988 27130<br />

Performance Parameters<br />

Particulars 2000-01<br />

2001-<br />

02<br />

2002-<br />

03<br />

2003-<br />

04<br />

2004-<br />

05<br />

2005-<br />

06<br />

PLF (%) 67.85 68.14 70.58 70.27 72.02 72.48<br />

Heat rate (kcal/kWh) 2558 2563 2566 2624 2640 2694<br />

Oil consumption (ml/kWh) 2.03 1.01 0.94 1.94 1.70 1.57<br />

Auxiliary consumption (%) 9.62 9.37 9.38 9.79 9.66 9.24<br />

Plant availability (%) 80.78 78.29 80.17 78.36 85.24 84.51<br />

Unscheduled breakdowns<br />

in terms <strong>of</strong> MWh1000<br />

4,062 5,524 5,096 5,209 3,223 2,262<br />

Total manpower employed<br />

9,148 at plant locations plus 300 at head quartersTotal<br />

9448<br />

9.22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!