Haryana<br />

Access. HVPNL and the DISCOMs have allowed Open Access to their networks as<br />

per the recent notification. The surcharge was not levied on consumers in order to<br />

encourage bulk consumers to transport power during the deficit periods. For the<br />

competition and Open Access, an enabling environment is necessary. There should<br />

also be clarity regarding surcharge to be levied as per the NTP.<br />

HSERC is expected to play a vital role in promoting competition and efficiency across<br />

the value chain in the power sector. Its composition with personnel having domain<br />

expertise and experience can inspire confidence in the stakeholders. HERC, at<br />

present, is facing manpower shortage at different levels. Keeping in view the vital role<br />

<strong>of</strong> HERC, personnel with relevant expertise need to be inducted into the Commission.<br />

The EA, 2003 has provided for establishment <strong>of</strong> a separate regulatory fund, to be<br />

constituted by the State Government. This would ensure greater financial autonomy<br />

to the Commission.<br />

GENERATION<br />

Under the ABT regime, the State should suitably augment its generation capacity<br />

either through State owned generation projects or suitable tie-ups with upcoming<br />

CPSU projects. Considering the fact that the State at present has a generating<br />

capacity <strong>of</strong> around 4,033 MW, it must endeavour for a capacity addition target <strong>of</strong><br />

around 3,000 MW in the next three to four years. This will be a prudent step given the<br />

fact that that UI charges, which are currently very high (between 9 to 10 per cent <strong>of</strong><br />

the total power purchase cost <strong>of</strong> the State), might get an upward revision in the future<br />

and may adversely affect States who are overdrawing from the grid to meet their<br />

peaking requirements.<br />

TRANSMISSION<br />

To further improve the reliability <strong>of</strong> transmission network, there is a need to devise an<br />

incentives mechanism on the lines <strong>of</strong> guidelines issued by CERC’s for determination<br />

<strong>of</strong> tariff for Central Transmission Utility.<br />

For the intra-State ABT regime, a number <strong>of</strong> preparatory steps are to be taken which<br />

shall be identified and implemented with adequate hand-holding by the Government<br />

<strong>of</strong> India, CEA and CERC and other related agencies.<br />