BACKGROUND<br />

WEST BENGAL<br />

The salient features <strong>of</strong> the power sector in West Bengal are as follows:<br />

i) The generating capacity <strong>of</strong> 5,772 MW comprises <strong>of</strong> 4,660 MW in the State<br />

sector, 312 MW from the DVC plus Central Allocation <strong>of</strong> 600 MW.<br />

ii) The length <strong>of</strong> transmission and distribution lines is 1,96,012 ckt km.<br />

iii) The transformer capacity is 38,408 MVA.<br />

iv) 84.97 per cent <strong>of</strong> the villages have so far been electrified. Number <strong>of</strong> pumps<br />

energised is about 1.15 lakh.<br />

v) Number <strong>of</strong> consumers is 7.3 million.<br />

vi) Demand in the State is 26,783 MU. Export outside the State was 3,171 MU in<br />

2004-05. The energy sale pattern in 2004-05 was 29.51 per cent domestic, 45.10<br />

per cent industrial, 12.04 per cent commercial, 4.36 per cent agricultural, 3.32<br />

per cent public service, 4.34 per cent traction and 1.32 per cent to other<br />

categories <strong>of</strong> consumers;<br />

vii) The Plant Load Factor (PLF) for the State sector thermal power stations was 66<br />

per cent in 2004-05 with average availability at 80 per cent. The AT&C loss for<br />

WBSEB was 37 per cent, whereas the T&D loss for the whole State was 25 per<br />

cent.<br />

viii) During 2005-06 the peak load was estimated to be 4,694 MW with availability <strong>of</strong><br />

3,981 MW. For the current year (2006-07), the peak load is estimated to rise to<br />

4,892 MW with availability increasing to 4,376 MW. The State is planning to<br />

bridge this gap during this year itself. The projections for 2011-12 are 5,832 MW<br />

<strong>of</strong> peak load with availability increasing to 6,990 MW. In 2005-06, availability<br />

was 29,678 MU whereas energy demand was 27,600 MU. During the current<br />

year the energy demand is likely to rise to 29,010 MU whereas the availability is<br />

likely to rise to 31,094 MU. Projections for 2011-12 are 48,545 MU <strong>of</strong><br />

availability with the energy demand rising to 37,020 MU.<br />

ONGOING PROJECTS<br />

i) Purulia Pumped Storage Project with capacity <strong>of</strong> 900 MW (4225 MW). Project<br />

cost is Rs 2,700 crore funded by JBIC. The first unit is scheduled to be<br />

commissioned in March 2007;<br />

ii) Sagar Dighi Thermal <strong>Power</strong> Project Phase I (2300 MW);