04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Orissa<br />

pre-condition for the deal. GRIDCO had to liquidate the entire loan and also make an<br />

escrow arrangement for payment <strong>of</strong> the current dues in full.<br />

Adjustment <strong>of</strong> Rs 343 crore by Government <strong>of</strong> Orissa while vesting the transmission<br />

and distribution assets in GRIDCO severely affected its liquidity position. This<br />

amount was payable by the State Government to OSEB/GRIDCO as subsidy (Rs 301<br />

crore) and energy charges (Rs 42 crore) due from Government Departments.<br />

GRIDCO continued to carry out un-remunerative activities such as rural electrification<br />

work on behalf <strong>of</strong> the Government <strong>of</strong> Orissa without any subsidy support from the<br />

Government, either capital or revenue.<br />

DISCOMs did not agree to take over the dues receivable from State PSUs and State<br />

Government Departments towards power supply and the same were retained with<br />

GRIDCO. GRIDCO is yet to receive the dues.<br />

TRANSFER OF ASSETS<br />

Restructuring was done in two steps through the instrumentality <strong>of</strong> Transfer Schemes<br />

framed under the Orissa Electricity Reform Act, 1995. Under the first Transfer<br />

Scheme (effective from 1 April 1996) the assets, liabilities, proceedings and personnel<br />

<strong>of</strong> the erstwhile OSEB were transferred to OHPC (for hydel generation), and<br />

GRIDCO (transmission and distribution). The second Transfer Scheme (effective<br />

from November, 1998) further transferred the distribution related assets, liabilities,<br />

proceedings and personnel <strong>of</strong> GRIDCO to four wholly owned companies <strong>of</strong> GRIDCO.<br />

Details <strong>of</strong> Revaluation done in Transfer Scheme dated 1 April 1996<br />

(Rs crore)<br />

Book value <strong>of</strong> T&D assets 1103.2<br />

Interest and expense capitalised 97.5<br />

Total 1200.7<br />

Uplift in value <strong>of</strong> assets 1120.0<br />

Total 2320.7<br />

Depreciation 363.0<br />

Net fixed assets <strong>of</strong> GRIDCO as on 1 April 1996 1957.7<br />

Total Revaluation<br />

Uplift in assets 1120.0<br />

Further adjustment 74.0<br />

Total 1194.0<br />

Adjustment<br />

Subsidy due to OSEB 301.2<br />

Electricity charges receivable from Government 39.2<br />

Reduction in O&M stock 50.6<br />

Total (A) 391.0<br />

5.11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!