04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

since 2003 and are still continuing. A consolidated picture <strong>of</strong> distribution sector <strong>of</strong><br />

Gujarat as available is given below:<br />

Various categories <strong>of</strong> consumers served by the DISCOMs are as under:<br />

Details <strong>of</strong> Consumers<br />

No. <strong>of</strong><br />

consumers<br />

1999-00 2000-01 2001-02 2002-03 2003-04 2004-05<br />

Residential 5342985 5540354 5700498 5817482 6099118 6400626<br />

Commercial 765997 802722 830226 850997 908412 947530<br />

Industrial LT 159902 156259 153923 150760 153097 157691<br />

Industrial HT 4546 4626 4678 4677 4820 5194<br />

<strong>Public</strong> lighting 17302 17595 17152 16686 16934 18583<br />

Railways 10 10 10 10 11 11<br />

Agricultural 566232 581494 600414 606210 648053 664059<br />

Water works 22497 24327 26072 27576 29904 31793<br />

Licensees 2 4 4 4 4 7<br />

Others 3 2 2 0 0 0<br />

Total 6369866 7127393 7332979 7474402 7860353 8225494<br />

<strong>Power</strong> Supply Position<br />

The table below indicates parameters related to quantitative and qualitative supply <strong>of</strong><br />

power to various consumers. A peak load <strong>of</strong> 8,170 MW is met and a total <strong>of</strong> 59,078<br />

MU was served by the DISCOMs in the year 2005-06.<br />

There is no power cut in major urban areas for HT consumers, industrial estates,<br />

Gujarat Industrial Development Corporation (GIDC) areas and the 168 Nagar Palikas.<br />

A total <strong>of</strong> 17,773 villages under JGY are supplied with 24 hours three-phase power<br />

supply. The remaining areas have power cuts for 4 to 5 hours a day.<br />

9.26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!