04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

State <strong>Report</strong>s (Vol.-III)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

PARAMETERS TO MEASURE THE EFFECTIVENESS OF REFORMS<br />

The impetus <strong>of</strong> distribution reforms in the State was to bring in discipline and cost<br />

effectiveness in the following key areas:<br />

Reliability and quality <strong>of</strong> power;<br />

Reduction <strong>of</strong> losses;<br />

Reduced Government support in terms <strong>of</strong> subsidy;<br />

Financial viability <strong>of</strong> sector;<br />

Capital expenditure; and<br />

Consumer services.<br />

This section attempts to bring in clear perspective the achievements <strong>of</strong> the distribution<br />

licensees on the above parameters to highlight the impact and effectiveness <strong>of</strong> the<br />

restructuring process.<br />

Reliability and Quality <strong>of</strong> <strong>Power</strong><br />

Extent <strong>of</strong> load Shedding<br />

Due to power shortage in the Northern Grid and to maintain grid discipline, both the<br />

DISCOMs shed around 2.5 to 3.0 MU on a daily basis. Besides the planned load<br />

shedding, the duration <strong>of</strong> unannounced load shedding remained 30 minutes to 1½ hrs,<br />

three or four times a day in 2005-06 across all categories <strong>of</strong> consumers. Agricultural<br />

consumers are given priority over industries and urban/mixed urban consumers. The<br />

utilities claim to supply power for at least 7 to 8 hrs daily for running the agricultural<br />

tubewells. This fact is disputed as per the tariff orders <strong>of</strong> the Commission.<br />

Number <strong>of</strong> Interruptions and Quality <strong>of</strong> Supply<br />

The number <strong>of</strong> interruptions has shown a marked increase since 2001-02 for both the<br />

DISCOMs. The annual interruption level per line has decreased for DHBVNL from<br />

75 in 2000-01 to 57 in 2004-05, but the average duration <strong>of</strong> interruption hrs/line has<br />

almost doubled showing the negative trend in reliability <strong>of</strong> power supply by the<br />

DISCOMs. The overall performance <strong>of</strong> 33 kV and 11 kV lines <strong>of</strong> DISCOMs is as<br />

follows:<br />

2.32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!