04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Maharashtra<br />

relief is the participative spirit <strong>of</strong> people from rural area to ensure that this important<br />

service <strong>of</strong> electricity supply caters to their needs and is controlled by them.<br />

In future, APY villages should be considered for additional fiscal support vis-à-vis<br />

non-APY villages. This participative spirit <strong>of</strong> rural consumers is a treasure and no<br />

effort should be spared in protecting the same against all odds.<br />

Gaothan Feeder Separation Scheme<br />

Another scheme, which can help reduce the peak demand, is ‘gaothan feeder<br />

separation scheme’. In this scheme the feeder supplying energy to a composite load<br />

comprising <strong>of</strong> agricultural pumps and the nearby village is separated by provision <strong>of</strong> a<br />

separate feeder for supplying energy to the village and retaining the existing feeder<br />

only for supplying the agricultural pumps. This can help in reducing the peak demand<br />

if the agricultural feeder could be switched on for a period <strong>of</strong> say 8-10 hours during<br />

defined <strong>of</strong>f-peak period and could be switched <strong>of</strong>f during peak-hours.<br />

Such assured supply <strong>of</strong> electricity for pumping though only in <strong>of</strong>f-peak hours, should<br />

be acceptable to farmers than uncertainty <strong>of</strong> supply. Also conservation <strong>of</strong> available<br />

water will in future be an important aspect, that will dictate the need for limiting the<br />

hours <strong>of</strong> agricultural pumping and such schemes will certainly be required then.<br />

The energy consumption in the gaothan feeder will show considerable growth and<br />

since this consumption is metered it will bring additional revenue to the utility. In<br />

selecting schemes for separation <strong>of</strong> gaothan feeder, priority should be given where the<br />

agricultural pumping load on the composite feeder is high, the length <strong>of</strong> the resultant<br />

gaothan feeder after separation is comparatively small.<br />

Besides the above, MSEDCL has launched a Ten-Point Action Plan, specifying<br />

programmes under each point, to improve the working <strong>of</strong> the company. The results <strong>of</strong><br />

these actions are expected to start becoming visible from the end <strong>of</strong> this year.<br />

Reduction in T&D losses<br />

Various steps are taken by MSEDCL for reducing distribution losses, like additions to<br />

the high voltage lines and sub-stations, improving HT: LT ratio, check on theft <strong>of</strong><br />

electricity, fixing <strong>of</strong> electronic time <strong>of</strong> day meters on HT connections, adding fixed<br />

and switched capacitors, etc. Monthly energy audit is carried out in respect <strong>of</strong><br />

distribution transformer centres (DTCs) (for which energy meters are fixed), express<br />

feeders, Maharashtra Industrial Development Corporation (MIDC) areas, etc.<br />

10.37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!