04.08.2013 Views

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

Report of Indian Institute of Public Administration ... - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Synopsis <strong>of</strong> State <strong>Report</strong>s (Vol.-IV)<br />

Study on `Impact <strong>of</strong> Restructuring <strong>of</strong> SEBs’<br />

could be credited to this Fund. Money raised through disinvestment <strong>of</strong> the<br />

State’s shares in power Utilities should also be credited to this Fund.<br />

• OHPC should be encouraged to take up new projects like Sindhol-I, II and<br />

III as run-<strong>of</strong>-the river schemes on the Mahanadi. A pump storage project<br />

should be set up below the Indravati Dam. NHPC could collaborate with<br />

OHPC. In order to maximise peak-time availability, Orissa’s hydropower<br />

potential should be fully utilised.<br />

• OHPC’s dues should be cleared by GRIDCO. With an improved balance<br />

sheet, OHPC can be partially disinvested, generating substantial funds for<br />

further investment.<br />

• The State Government’s share in the OPGC should be brought down from<br />

51 per cent to 26 per cent. The proceeds from such a disinvestment can be<br />

ploughed back into the power sector.<br />

• Consumer grievance redressal mechanism should be strengthened in all<br />

the four DISCOMs.<br />

• There is acute shortage <strong>of</strong> technical manpower at all levels. This situation<br />

should be promptly remedied by GRIDCO, OHPC and all the DISCOMs.<br />

63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!