de1 proyecto y liltimamente resukar5 en mejores<br />
proyectos.<br />
17tdOQ VVYC ” drill ““I Pm-wLldfi * * “-, *c-v<br />
Los costos de1 proyecto son 10s costos requeridos a<br />
trav& de1 tiempo para consttir y operar una planta<br />
hidroektriea. Los costos anuales y 10s requisitos de1<br />
capita; serfin desarrollados en las porciones civiles,<br />
mecgnicas y ektricas de 10s estudios de1 proyecto.<br />
Esto cklculos estimativos por lo general han de:<br />
i. Ser declarados en dblaree de1 tie en que se<br />
realice el estudio.<br />
2. Suministrar un patrdn de 10s gastos de1 costo de<br />
capital para cada afio de la construcci6n. Esto<br />
serA tipicamente expresado <strong>com</strong>a porcentajes de1<br />
costo toal estimado por aiio.<br />
S.Indicar si 10s costos e&in sujetos ;L escalamiento.<br />
4.Proveer fondos para reparaci6n y repuesto de<br />
equipos mayores necesarios para la operaci6n de1<br />
proyecto durante el period0 de1 financiamiento.<br />
Para 10s proyectos mayores con extensos periodos<br />
de construc&n, el yatr6n de gastos puede tener<br />
efectos importantes en ia economia de1 proyecto.<br />
Para ias pequefias plantas hidrdulicas decentralizadas<br />
en consideraci6n aqti, 10s periodos de construcci6n<br />
han de ser cortos por lo general y en consecuencia<br />
10s p2trones de gastos no tendran tanta importancia.<br />
La Tabla 1 presenta un resumen de las fuentes<br />
generales de informaci6n acerca de1 cost0 de1<br />
proyecto. Para ios proyectos pequefios en considera-<br />
ci6n, esta informaci6n podr5 ser totalmente generada<br />
por una persona y podr5 ser considerablemente<br />
simplificada en <strong>com</strong>paracidn con la requerida de un<br />
proyecto de multimegawatts. El nivel de1 detalle de<br />
cost0 y su precisi6n tendrgn que ver con las cir-<br />
cunstancias de la operaci6n y el costo total de1<br />
proyecto en consideracibn.<br />
Evaluacih Econbmica<br />
El anfilisis econ6mico trata primordialmente de1<br />
desarrollo y aplicaci6n de1 anhlisis de beneficio y<br />
costo que es e! procedimiento usado rnes frecuente-<br />
mente para la evaluaci6n de la economia de1<br />
proyecto. El objective de este tipo de an&!isis es rela-<br />
nionar todos 10s beneficios econGmicos de1 proyecto a<br />
todos 10s costos econ6micos de1 proyecto que resultan<br />
a quien auspicia el proyecto. La extensi6n apropiada<br />
de1 an5lisis (10s beneficios y costos que se deban<br />
incluir en el anklisis) depende en g-ran escala de la<br />
naturaleza de la organizacibn auspiciadora. Los <strong>com</strong>-<br />
ponentes importantes de1 an&lisis econdmico son 10s<br />
costos anuales iniciales de1 proyecto y 10s costos<br />
4. Provide funds for repair and r+!ac2ment of<br />
major equipment necessary for proiect<br />
operation through ,the financing period.<br />
ioi n-iajoi Z&iojecis Witi- iei-,gtiIy i;oi,sifuciiorj<br />
periods, the expenditure pattern can have impor-<br />
tant effects on project economics. For the small<br />
decentralized hydro projects being considered<br />
here, short construction periods wiil be the rule<br />
and consequently the expenditure pattern may<br />
not be very important.<br />
Table 1 summarizes the generai sources of the<br />
project cost information. For the small project<br />
being considered, this information may all be<br />
generated by one parson and may be con-<br />
siderably simplified over that required for a multi-<br />
megawatt project. The level of cost detail, and its<br />
accuracy, will be tied to the circumstances at<br />
hand and to the overall cost of the contemplated<br />
project.<br />
Economic Evaluation<br />
Economic analysis deals primarily with the<br />
development and application of benefit-cost<br />
analysis which is the most frequently used pro-<br />
cedure for project economic evaluation. The ob-<br />
jective of this type of analysis is to relate all pro-<br />
ject economic benefits to all project economic<br />
costs accruing to the project sponsor. The ap-<br />
propriate scope of the analysis (the benefits and<br />
costs that should be included in the analysis)<br />
depends largely on the nature of the sponsoring<br />
organization. Important ccmponents of the<br />
economic analysis are the project’s initial and<br />
recurring annual costs and annual revenues.<br />
These items are the primary concern in the finan-<br />
cial analysis. However, other costs and benefits<br />
not included in the project financial analysis may<br />
properly be included in the economic analysis.<br />
An example would be fishery benefits accruing<br />
from establishing an impoundmer:t for small<br />
hydro purposes. Note that such benefits would<br />
accrue to the area, but probably would not in-<br />
fluence the finances of the project.<br />
Framework of E<strong>com</strong>omic Evaluation. TQe most<br />
efficient use of resources is the objective of<br />
economic analysis as measured by economic<br />
evaluation criteria such as the benefit/cost (B/C)<br />
ratio. This objective will generally be met if the<br />
project net benefits are maximized and the scope<br />
of the analysis is properly formulated. Within this<br />
t:‘smework, many small hydroelectric projects<br />
LX! be analyzed as single-purpose, stand-alone<br />
106