zona altiplanica y cordillerana, 10s valles y el tropico.<br />
Las caracterfsticas climatologicas determinan dif-<br />
erencias de formas de vida entre sus pobladores. En<br />
10s proyectos de electrifrcacion rural la experiencia<br />
nos permite estimar que la dotacion initial se aprox-<br />
ima a 10s 60 kilovatios hora mes abonado para el<br />
tropico, de 40 kilovatios hora mes abonado para 10s<br />
valles y 30 kilovatios hor mes abonado para el<br />
altiplano y la zona cordillerana.<br />
Se estima inicialmente en 10s proyectos en el area<br />
rural 16 habitantes por abonado y despues de 10<br />
afios de servicio se llega a 6 habitantes por abonado<br />
valores que son considerados para servicio domestic0<br />
a lo que se aiiaden las cargas industriales, alumbrado<br />
ptiblico y otros.<br />
Poblaciones en el Area Rural<br />
Dentro de 10s alcances de 10s proyectos de electri-<br />
ficacion rural y apoyandonos en 10s resultados<br />
obtenidos en el tiltimo censo national de poblacion y<br />
vivienda hemos dividido 10s centros poblados de<br />
acuerdo al siguiente detalle: poblaciones con menos<br />
de 200 habitantes, poblaciones de 200 a 500<br />
habitantes, poblaciones de 500 a 1000 habitantes,<br />
poblaciones de 1000 a 2000 habitantes, poblaciones<br />
2000 a 5000 habitantes, poblaciones de 5000 a 10000<br />
habitantes, y poblaciones de 10000 a 20000<br />
habitantes.<br />
Todas las poblaciones mayores ya no son con-<br />
sideradas dentro de 10s proyectos de Electrification<br />
Rural y son atendidos en generation, transmision y<br />
distribution por ENDE, COBEE y las empresas<br />
distribuidoras.<br />
De las poblaciones que se hallan entre 2000 y<br />
20000 habitantes, aproximadamente entre ei 45% y<br />
el 50% es&In interconectados a 10s grandes sistemas<br />
de ENDE, COBEE y Comibol, mientras que las<br />
otras, cuentan con sistemas de pequena generation<br />
en la mayor parte t&mica que debe ser reemplazada<br />
o pequenas plantas hidroelectricas que resultan ob-<br />
soletas y que por tanto deben tambien ser sustittidas<br />
y en algunos otros cases que carecen absolutamente<br />
de energia electrica.<br />
En las poblaciones que cuentan con 2000<br />
habitantes o menos, el problema es mas acentuado ya<br />
que aproximadamente entre el30 a 35% es& inter-<br />
cone&ados a 10s grandes sistemas, mientras que 10s<br />
restantes cuentan con pequenas unidades de<br />
genera&n t&mica o hidraulica que debe ser me-<br />
jorada o simplemente no cuentan con energfa.<br />
Por lo analizado las potencias en cuanto se refiere<br />
a micro centrales <strong>com</strong>prenderian desde 20 kV hasta<br />
kV con algunos cases excepcionales de 1 a 5 MV.<br />
the tropical areas, with climate characteristics<br />
determining differences in lifestyles among its in-<br />
habitants.<br />
Rural electrification project experience has<br />
shown that initial allotment is nearly 6OkWh per<br />
month per service for the tropical areas, 40kWh<br />
monthly in the valley region and 30kWh in the<br />
“altiplano” and the Andean ridge. In rural areas,<br />
16 inhabitants per service are initially estimated.<br />
10 years thereafter, 6 inhabitants per service<br />
which are projected for domestic service. To this<br />
must be added public industrial lighting.<br />
Towns in Rural Areas<br />
Within the reach of rural electrification pro-<br />
jects and based on results obtained in the last<br />
national census of population and dwellings, we<br />
have divided population centers by their popula-<br />
tion levels. Towns of more than 20,000 in-<br />
habitants are no longer considered within rural<br />
electrification projects and are served by ENDE,<br />
COBEE and distributing corporations in regard to<br />
their generation, transmission and distribution<br />
needs.<br />
Of those towns having between 2,000 to<br />
20,000 inhabitants, approximately 45 to 50% are<br />
linked to the <strong>com</strong>plex systems of ENDE, COBEE<br />
and COMIBOL, while others have small<br />
powerplants, mostly thermal, which should be<br />
replaced, or have hydroelectric plants which have<br />
be<strong>com</strong>e obsolete and must therefore be replaced,<br />
while others lack electric energy altogether.<br />
While the problem is more acute in towns of<br />
2,000 or less inhabitants, with 30 to 35% linkage<br />
to <strong>com</strong>plex (large) systems, all the remaining<br />
ones, have small generating thermal or hydro<br />
units which should be improved or which do not<br />
have any.<br />
As can be inferred, capacity of small<br />
hydroelectric powerplants includes those from<br />
20kW to 500kW with some exceptional cases<br />
from 1 to 5MW, which in fact, are few.<br />
In order to find positive solutions to the energy<br />
situation, we are analyzing results obtained by<br />
the <strong>National</strong> Meteorological and Hydrological<br />
Service, based on the fact that since this<br />
organization has hydraulic plants in some of the<br />
main rivers, such resources can be utilized for<br />
hydroelectric generation,<br />
The following number of power plants are in<br />
operation:<br />
La Paz 60 stations<br />
Cochabamba 50<br />
287