Tuberia<br />
La Tuberia tendra 10s siguientes diametros<br />
para 500 l/s : 45 cm<br />
para 250 l/s : 35 cm<br />
para 150 l/s : 25 cm<br />
En terreno tendido (30” 6 menos de inclination<br />
media) se aumentar6 el digmetro de Tuberia en 5<br />
cm., para disminuir las pkrdidas por friccidn en las<br />
Tuberias.<br />
El espesor de las planchas serg de l/8 U en ctidas<br />
hasta de 50 m., y mayor solo en ias tramos inferiores<br />
de plantas con caidas mayores.<br />
Casa de Mkpinas<br />
Las dimensiones de la casa de maquinas depende<br />
de las medidas de la maquinaria y sus fundaciones<br />
serhn indicadas generalmente por 10s fabricantes de<br />
&ta.<br />
Conviene applicar, para las Centrales pequeiias,<br />
tipos de construction economica y con materiales, de<br />
acuerdo con la region en que esti ubicada. Cuando se<br />
in&alar! varios grupos de generacidn (Turbinas-<br />
Generadores) se debe dejar entre estos suficiente<br />
espacio para no dificultar el trabajo de revisiones y<br />
reparaciones en cualquiera de estos distancia<br />
re<strong>com</strong>endable 1.50 2 m); y disponer suficiente espacio<br />
para el montaje de ellos.<br />
Canales de Uemasia (Aliviador) y de Descarga<br />
El Canal de Demasia (Aliviador) devuelve de la<br />
Taza al tie las aguas sobrantes, no usadas para la<br />
Generacidn de Energia. Se construye generalmente<br />
con fuerte declive, con se&on-suficiente para con-<br />
ducir el cauda! mkximo qde pdeda entrar a la Taza.<br />
Como Segundo tramo de1 canal se usara muchas<br />
veces una quebrada u ollada natural, sin revesti-<br />
miento si es rocosa o tiene subsuelo e&able que se<br />
limpiara por la erosion de aguas que - llevark<br />
El Canal de Descarga devuelve al rio las aguas tur-<br />
binadas que salen de la Central. Cuando hay m&s de<br />
una Turbina sus descargas confltiran hacia este<br />
Canal; salvo cuando hay muy poca distancia al rio,<br />
case en el cual la descarga de cada Turbina desem-<br />
bocara directamente en cste. Para evitar la erosion<br />
de las desembocaduras, &tas deben construirse con<br />
revestimiento fuerte y generalmente se requeriran<br />
obras de defensa en la orilla de1 rio, seg%in las condi-<br />
ciones locales.<br />
153<br />
length and depth of the forebay, so that the sur-<br />
face of the sand trap remains the same and the<br />
speed of the water does not go above 20 cm/s<br />
(See Sand Trap Table).. The intake to the<br />
penstock, protected by a fine screen and a gate,<br />
should be 80 cm under the surface of the water<br />
at the forebay and have the shape of a funnel<br />
with rounded edges.<br />
Penstock<br />
The penstock will have the following<br />
diameters:<br />
for 500 I/s : 45 cm<br />
for 250 I/s : 35 cm<br />
for 150 I/s : 25 cm<br />
In extended terrain, (an average slope of 30”<br />
or less) the diameter of the penstock should in-<br />
crease by 5 cm to decrease the loss due to fric-<br />
tion in the pipe.<br />
The penstock pipe should be 118” thick for<br />
heads of up to 50m, and should only be bigger in<br />
the lower sections of plants with higher heads,<br />
Piowerhoiise<br />
The size of the powerhouse depends on the<br />
size of the machines and the foundations<br />
generally will be specified by the manufacturers.<br />
At small hydropower stations, economic con-<br />
struction methods should be used with local<br />
materials depending on what is available in the<br />
region where they are located. When several tur-<br />
bine generators are to be installed, enough space<br />
should be left between them to facilitate inspec-<br />
tion and repair work on either of them (re<strong>com</strong>-<br />
mended distance 1.50 to 2.00 m) and to provide<br />
enough space to install them.<br />
Spillway Canal and Tailrace<br />
The spillway canal returns the excess waters,<br />
that water which has not been used for energy<br />
generation, from the forebay to the river. It is<br />
generally constructed with a slope steep enough<br />
to carry the maximum flow which could enter the<br />
forebay. A natural ravine can frequently be used<br />
as a second stretch of the canal without lining if<br />
it is rock or if it has a stable subsoil which will<br />
be cleaned by erosion.<br />
The tailrace returns to the river the water that<br />
has gone through the turbine. When there is<br />
more than one turbine, their tailwaters should<br />
converge towards a <strong>com</strong>mon tailrace. When there<br />
is very little distance to the river, the tailwater<br />
will be discharged directly into it. To prevent ero-