localidades posibles desde una sola minicentral. El<br />
costs, por subtransmisidn es muy inferior al cost0 de<br />
generation. Del andisis de costos se concluye:<br />
1. Que el costo de subtransmision es muy inferior<br />
al de generation.<br />
2. Que a mayor tamano de la central, es menor el<br />
cost0 de la energia.<br />
Por tanto se re<strong>com</strong>ienda:<br />
1.. IJtilizar al m&&o la interconexion entre<br />
localidades mediente lineas, tratando que un<br />
nlimerod maxim0 de pueblos Sean abastecidos<br />
desde una sola central. Se debe evitar la con-<br />
struccicin de m&s de Tuna minicentral dentro de<br />
unit region. Solo en cases de localidades<br />
<strong>com</strong>pletamente aisladas debe construirse<br />
minicentrales de potencia minimas.<br />
2. Cuando tecnicamente sea posible, consttir por<br />
etapas, el analisis de costos hate evidente la<br />
necesidad de valuar y seleccionar proyectos, de-<br />
biendo darse prioridad a 10s proyectos de mayor<br />
calificacion.<br />
Comparaciih con otras<br />
Alternativas de Suministro<br />
Como se menciono en el capitulo No 1 las fuentes<br />
de energia utilizada3 en el Peru para electrification<br />
rural son:<br />
- Generation T&-mica<br />
- Generation Hidraulica<br />
- Interconexion<br />
En general se puede concluir que debido a 10s precios<br />
de1 petroleo, inciertos y cada &a m&s elevados, la<br />
generation t&-mica es la alternativa menos reeomen-<br />
dada, debiendo limitarse solo a aquellas miniregiones<br />
donde no exita otra alternativa.<br />
La interconexion de un Pequeno Sistsma Electrico<br />
a un Sistema Principal, cuando este sea vecino, y me<br />
diante lineas, de preferencia de 13.2 kV (6 10 kV), es<br />
la m&s eonveniente; en algunos eases puede alcan-<br />
zarse el nivel de 33 kV. Para miniregiones donde no<br />
sea posible la interconexion, la generacidn hidraulica<br />
es la m&s economica. En resumen, para cada<br />
miniregion debe estudiarse las alternativas de<br />
suministro.<br />
Fuentes de Financiamiento<br />
En diciembre de 1978, por Resolution Ministeria .l<br />
No. 1475-73EM-OSP se cre6 el Fondo para la<br />
Electrification con pequenas Centrales Hidroelectricas,<br />
debiendo ELECTROPERU destinar e!<br />
15% de su rents. anual y de la utilidad que le corresponda<br />
por su participation accionaria en las<br />
307<br />
the cost analysis, we <strong>com</strong>e to the conclusion<br />
that:<br />
1. Subtransmission costs are lower than<br />
generat ion costs.<br />
2. The larger the capacity of the power plant,<br />
the lower the cost of energy.<br />
Therefore it is re<strong>com</strong>mended:<br />
1. To maximize interconnection between<br />
localities through transmission lines so that<br />
a maximum number of <strong>com</strong>munities receive<br />
energy supply from only one power plant.<br />
Construction of more than one ministation in<br />
the same region should be avoided. Only in<br />
cases of <strong>com</strong>pletely isolated localities<br />
should ministations of minimal capacity be<br />
installed.<br />
2. Whenever it is technically possible, instaila-<br />
tion should be done in stages. Cost analysis<br />
makes evident the need for evaluation and<br />
selection of projects, giving priority to those<br />
scoring the highest.<br />
Comparison with other Nternative Sources<br />
As mentioned earlier, the sources of energy us-<br />
ed in Peru for rural electrlficalion are:<br />
- thermal generation<br />
- hydraulic generation<br />
- interconnection<br />
In general, we may conclude that due to the pre-<br />
sent day prices of petroleum, uncertain and<br />
higher every day, thermal generation is the least<br />
advisable alternative and it should be limited to<br />
those mini-regions where other alternatives are<br />
unavailable,<br />
The interconnection of a small electric system<br />
to a bulk system, when this is nearby, by means of<br />
lines preferably of 13.2 kV (or 10 kV), is the most<br />
convenient. In some cases the veltage may go up<br />
to a level of 33 kV. For mini-regions where inter-<br />
connection is not feasible, hydropower genera-<br />
tion is the most economical. In summary, for<br />
each mini-region the alternative sources for sup-<br />
ply should be researched on their own merits.<br />
Sources of Financing<br />
In December 1978, by Ministerial Resolution<br />
No. 147578-EM-OSP, a fund was created for<br />
electrification using sma!l hydroelectric<br />
powerp!an!s whereby E lectroperu should assign<br />
15% of its annual revenues plus the dividends<br />
accrued in other public utility enterprises. This