10s consumidores con tarifa <strong>com</strong>ercial e industrial<br />

cuya carga instalada sea mayor de 10 kW para 10s in-<br />

dustriales y el consumo mayor que 2.500 kWh por<br />

mes para 10s <strong>com</strong>erciantes. Esta imposition se<br />

justifica en el hecho de que 10s abonados industriales<br />

y <strong>com</strong>erciales utilizan la energia electrica para la<br />

obtencidn de ganancias, elaboration de productos<br />

cuyo mayor consumo se halla en las zonas urbanas y<br />

es justo contribuir por ese intermedio al desarrollo de<br />

la electrification rural.<br />

Una proyeccion de la recaudacion que podrfa<br />

significar esta contribution para 10s anos 1980, 1981<br />

y 1982 son 10s siguientes, divididos en lo que podtia<br />

recaudarse a traves de las dos empresas mayores de1<br />

pais (QUITO Y GUAYAQUIL) y el resto de1 pais:<br />

(cifras en US$).<br />

E mpresa E mpresa Resto<br />

4AO Quito Guayaquil Pais Total<br />

i!l>((j<br />

L_ 944.899 2’130.883 1’215.410 4’291.192<br />

1981 1’203,198 2’748.839 1’737.493 5’689.530<br />

1982 1’537,731 3’546.002 2’508.189 7’591.422<br />

Mediante la creation de1 llamado “Fond0 Especial<br />

para Conexiones a Consumidores de Bajos Ingresos”,<br />

que se alimenta con recursos provenientes de un<br />

diferencial de inter& de prestamos externos<br />

otorgados en condiciones concesionarias por en-<br />

tidades financieras de desarrollo tales <strong>com</strong>a el (BID),<br />

el Kredit Anstalt Bank fuer Wiederaufbau de<br />

Alemania Federal, Gobiernos, etc. y que se produce<br />

cuando estos prestamos, suscritos con el Gobierno de1<br />

Ecuador, son transferidos a BJECEL en condiciones<br />

de inter& un poco mas alto y plazo de amortization<br />

m&s corto, creando un fondo que basicamente puede<br />

trabajar <strong>com</strong>a una fuente de prestamos, para la<br />

financiacion de redes de distribution secundarias y<br />

a<strong>com</strong>etidas de servicio electrico en zonas rurales y<br />

urbanas marginadas, e instalaciones de alumbrado<br />

public0 en esas mismas zonas; 10s prestamos de ese<br />

fondo seran hechos a las Empresas Electricas, pero<br />

no parece existir conflict0 en otorgarlos tambien a<br />

otro tipo de entes administrativos que podrian<br />

establecerse para la operation de estos sistemas<br />

decentralizados de abastecimiento de energia. A su<br />

vez, estas Empresas y entes administrativos pueden<br />

otorgar prestamos a 10s mismos consumidores de ba-<br />

jos ingresos, para ay-udarlos a financiar el costo de<br />

las a<strong>com</strong>etidas en las casa y eventualmente las<br />

instalaciones interiores. Para el manejo de este fondo<br />

y el otorgamiento de 10s prestamos existe un<br />

reglamento especial.<br />

IJna proyeccion de las recaudaciones que se han<br />

obtenido y podra obtenerse en 10s proximos 5 afios<br />

279<br />

10 per cent of the invoiced value of electrical<br />

bills for <strong>com</strong>mercial and industrial consumers<br />

with an installed load greater than 10 kW for in-<br />

dustrial clients and a monthly consumption<br />

greater than 2,500 kWh for <strong>com</strong>mercial clients.<br />

This tax is justified by the fact that the industrial<br />

and <strong>com</strong>mercial clients titilize electric power to<br />

derive profits from processing goods largely con-<br />

sumed in urban areas and it is just, therefore,<br />

that they should contribute in this way to the<br />

development of rural electrification.<br />

It is projected that for the years 1980, 1981 and<br />

1982, this contribution could reach the amounts<br />

given below, broken down for the two main elec-<br />

trical enterprises in the country (Quito and<br />

Guayaquil) and the remainder of the country (in<br />

us&.<br />

Remainder<br />

Quito Guayaquil of the<br />

Year Utility Utility Country Total<br />

1980 944,899 2,130,883 1,215,410 4,291,192<br />

1981 1,203,198 2,748,839 1,737,493 5,689,530<br />

1982 1,537,731 3,546,002 2,508,189 7,591,422<br />

With the creation of the so-called “Special<br />

Fund for Connections for Low In<strong>com</strong>e Con-<br />

sumers”, supplied with resources <strong>com</strong>ing from<br />

an interest differential of external loans granted<br />

under concessionary terms by financial develop-<br />

ment organizations such as the IDB, the Kredit<br />

Anstalt Bank fuer Wiederaufbau, of the Federai<br />

Republic of Germany, other governments, etc.<br />

The differential occurs when these loans,<br />

subscribed by the Government of Ecuador, are<br />

transfered to I~vECEL at a slightly higher interest<br />

rate and a slightly shorter repayment term, thus<br />

creating a fund that basically can serve as a<br />

source of loans for financing secondary distribu-<br />

tion networks and connections for electrical ser-<br />

vice in rural and marginal urban areas and for the<br />

installation of public lighting systems in these<br />

same areas. The loans from such a fund will be<br />

made to Electric Power Enterprises, but there ap-<br />

pears to be no conflict in also granting loans to<br />

other hypes of administrative organizations which<br />

may be established for the operation of these<br />

decentralized power supply systems. In turn,<br />

these enterprises and administrative organiza-<br />

tions may grant loans to low-in<strong>com</strong>e consumers<br />

to help them finance the cost of electrical con-<br />

nections to their homes and eventually of interior<br />

installations. There is a special set of regulations