23.04.2013 Views

Small Decentralized Hydropower Program National ... - Cd3wd.com

Small Decentralized Hydropower Program National ... - Cd3wd.com

Small Decentralized Hydropower Program National ... - Cd3wd.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

- Estimacidn de la demanda.<br />

- Disefio de las obras, seleccih de <strong>com</strong>ponentes,<br />

construccih e instalacicin.<br />

- Organizacih de la operacih y mantenimiento,<br />

con intervencih directa de 10s usuarios y con<br />

soportes opcionales, de organismos<br />

extra<strong>com</strong>unales.<br />

- Financiamiento.<br />

- Evaluacih y adaptacidn de1 sistema.<br />

0 Complementacih de las instituciones 1 y 2, de<br />

soporte.<br />

Durante todas las fases de desarrollo de1 programa,<br />

tienen lugar acciones de planificacih, coordinacih,<br />

evaluacih y realimentacih.<br />

La cuarta macroactividad, de diseminacihn, cor-<br />

responde a la operacih de1 sistema, creado a trav&<br />

de la macroactividad 3. La capacidad de funciona-<br />

miento de1 sistema se manifiesta poco despu& de in-<br />

iciada la macroactividad 3 y va amplihdose,<br />

paulatinamente, conforme se perfeciona. La<br />

diseminacion provee canales, que retroalimentan y<br />

ajustan al sistema. Los actores principales de1 pro-<br />

ceso de diseminacih estin descentralizados, de<br />

acuerdo a 10s lineamientos de la Politica de Desar-<br />

rollo Rural de1 Plan <strong>National</strong> de Desarrollo.6<br />

Instituciones 1<br />

La diversidad de actividades de1 programa,<br />

(esquemgticamente indicadas), la dispersih<br />

geogrtiica de las obras y la filosofia de1 Plan<br />

<strong>National</strong> de Desarrollo; requieren de la participacih<br />

de gran ndmero de instituciones 1. Las principales<br />

instituciones 1, clasificadas, de acuerdo a su funcih<br />

principal o ramo de actividades, se indican a<br />

continuacih:<br />

Coordinacih y desarrollo energetic0<br />

centralizado y<br />

descentralizado: I.N.E.<br />

Desarrollo y explotacih<br />

de sistemas ektricos: INECEL, Empresas<br />

El&tricas.<br />

Tecnologia: Politicnicas.<br />

Consultoras.<br />

Proveedores de Equipo.<br />

Industriales Nacionales.<br />

Organismos tknicos y<br />

de asistencia extranjeros.<br />

Ingenieria y<br />

construccih: Consultoras,<br />

constructoras, pobla-<br />

dores, rurales (mingas).<br />

0 Development and/or adoption of standard<br />

methodologies for:<br />

- Prioritizing microhydroprojects<br />

- Demand estimation<br />

- Design of civil works, selection of <strong>com</strong>-<br />

ponents, construction and installation.<br />

- Organization of operation and<br />

maintenance, with direct intervention of<br />

consumers and optional support by extra-<br />

<strong>com</strong>munity organizations.<br />

- Financing<br />

- Evaluation and adaptation of the system.<br />

0 Supplemental support for institutions 1 and 2.<br />

Planning, coordination, evaluation and realign-<br />

ing activities take place during all phases of the<br />

program development.<br />

Macroactivity 4, that of dissemination, is a<br />

function of the system created through macroac-<br />

tivity 3. The functional capacity of the system is<br />

manifested slightly after initiation of macroactivi-<br />

ty 3 and it expands gradually as it is being refin-<br />

ed. Dissemination provides canals that produce<br />

feedback and adjust the system. The main im-<br />

plementing agents in the dissemination process<br />

are decentralized in line with the policies of the<br />

<strong>National</strong> Plan for Development of Rural Elec-<br />

trification.6<br />

Institutions 1<br />

The diversity of activities of the program, as in-<br />

dicated in the design, the wide spread<br />

geographical location of the civil works and the<br />

philosophy of the <strong>National</strong> Development Plan, all<br />

require the participation of a great number of in-<br />

stitutions 1. The main institutions 1, classified in<br />

terms of their main function or type of activities<br />

are indicated below:<br />

Coordination and<br />

development of cen-<br />

tralized and decen-<br />

tralized energy: I.N.E.<br />

Development and<br />

exploitation of elec-<br />

trical systems: INECEL, Electrical Enter-<br />

prises<br />

Technology: Polytechnical<br />

Consulting<br />

Equipment Providers<br />

Local Industries<br />

Technical organization and<br />

foreign assistance

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!