Small Decentralized Hydropower Program National ... - Cd3wd.com
Small Decentralized Hydropower Program National ... - Cd3wd.com
Small Decentralized Hydropower Program National ... - Cd3wd.com
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
- Estimacidn de la demanda.<br />
- Disefio de las obras, seleccih de <strong>com</strong>ponentes,<br />
construccih e instalacicin.<br />
- Organizacih de la operacih y mantenimiento,<br />
con intervencih directa de 10s usuarios y con<br />
soportes opcionales, de organismos<br />
extra<strong>com</strong>unales.<br />
- Financiamiento.<br />
- Evaluacih y adaptacidn de1 sistema.<br />
0 Complementacih de las instituciones 1 y 2, de<br />
soporte.<br />
Durante todas las fases de desarrollo de1 programa,<br />
tienen lugar acciones de planificacih, coordinacih,<br />
evaluacih y realimentacih.<br />
La cuarta macroactividad, de diseminacihn, cor-<br />
responde a la operacih de1 sistema, creado a trav&<br />
de la macroactividad 3. La capacidad de funciona-<br />
miento de1 sistema se manifiesta poco despu& de in-<br />
iciada la macroactividad 3 y va amplihdose,<br />
paulatinamente, conforme se perfeciona. La<br />
diseminacion provee canales, que retroalimentan y<br />
ajustan al sistema. Los actores principales de1 pro-<br />
ceso de diseminacih estin descentralizados, de<br />
acuerdo a 10s lineamientos de la Politica de Desar-<br />
rollo Rural de1 Plan <strong>National</strong> de Desarrollo.6<br />
Instituciones 1<br />
La diversidad de actividades de1 programa,<br />
(esquemgticamente indicadas), la dispersih<br />
geogrtiica de las obras y la filosofia de1 Plan<br />
<strong>National</strong> de Desarrollo; requieren de la participacih<br />
de gran ndmero de instituciones 1. Las principales<br />
instituciones 1, clasificadas, de acuerdo a su funcih<br />
principal o ramo de actividades, se indican a<br />
continuacih:<br />
Coordinacih y desarrollo energetic0<br />
centralizado y<br />
descentralizado: I.N.E.<br />
Desarrollo y explotacih<br />
de sistemas ektricos: INECEL, Empresas<br />
El&tricas.<br />
Tecnologia: Politicnicas.<br />
Consultoras.<br />
Proveedores de Equipo.<br />
Industriales Nacionales.<br />
Organismos tknicos y<br />
de asistencia extranjeros.<br />
Ingenieria y<br />
construccih: Consultoras,<br />
constructoras, pobla-<br />
dores, rurales (mingas).<br />
0 Development and/or adoption of standard<br />
methodologies for:<br />
- Prioritizing microhydroprojects<br />
- Demand estimation<br />
- Design of civil works, selection of <strong>com</strong>-<br />
ponents, construction and installation.<br />
- Organization of operation and<br />
maintenance, with direct intervention of<br />
consumers and optional support by extra-<br />
<strong>com</strong>munity organizations.<br />
- Financing<br />
- Evaluation and adaptation of the system.<br />
0 Supplemental support for institutions 1 and 2.<br />
Planning, coordination, evaluation and realign-<br />
ing activities take place during all phases of the<br />
program development.<br />
Macroactivity 4, that of dissemination, is a<br />
function of the system created through macroac-<br />
tivity 3. The functional capacity of the system is<br />
manifested slightly after initiation of macroactivi-<br />
ty 3 and it expands gradually as it is being refin-<br />
ed. Dissemination provides canals that produce<br />
feedback and adjust the system. The main im-<br />
plementing agents in the dissemination process<br />
are decentralized in line with the policies of the<br />
<strong>National</strong> Plan for Development of Rural Elec-<br />
trification.6<br />
Institutions 1<br />
The diversity of activities of the program, as in-<br />
dicated in the design, the wide spread<br />
geographical location of the civil works and the<br />
philosophy of the <strong>National</strong> Development Plan, all<br />
require the participation of a great number of in-<br />
stitutions 1. The main institutions 1, classified in<br />
terms of their main function or type of activities<br />
are indicated below:<br />
Coordination and<br />
development of cen-<br />
tralized and decen-<br />
tralized energy: I.N.E.<br />
Development and<br />
exploitation of elec-<br />
trical systems: INECEL, Electrical Enter-<br />
prises<br />
Technology: Polytechnical<br />
Consulting<br />
Equipment Providers<br />
Local Industries<br />
Technical organization and<br />
foreign assistance