la carga), estructura adecuada de1 sistema de tarifas, power which will either provide a service already<br />

posibilidad de1 uso de estufas que almacenan el calor, performed by other means or will introduce a<br />

medios de distribucih de la electricidad a bajo cost0 new industrial activity to the area.<br />

(por ejemplo, alambre linico de retorno a tierra) y Technology innovator and transfer groups such<br />

estructuras adecuades de propiedad y administracih. as ITDG or srmilar organizations have as their<br />

Cost0 Total<br />

Total Cost<br />

0% x low<br />

300<br />

200<br />

100<br />

C<br />

Costo Anual Total y Costo Unitario Comparado con la Energia Generada y Utilization de la<br />

Capacidad para Instalaciones Diesel e Hidroelectricas de 40 kW<br />

Annual Total Cost & Unit Cost Against Power Generated & Capacity Utilisatlon for 40 kW Diesel &<br />

Hyro-electric Installations<br />

Cost0 Total de Operation Diesel<br />

Total Operating Cost (Diesel)<br />

Cost0 Total de Opera&on Hyde1<br />

Total Operating Cost (Hydel)<br />

Cost0 Unitario Diesel<br />

Unit Cost (Diesel)<br />

Corn Unhrio Hyde1<br />

Unit Cost (Hydel)<br />

I<br />

I I I Energia Generada (kWh)<br />

32.000 kWh 100,000 200,000 300,ooo 350,000 Power Generated (kWh)<br />

I I 1 I I 1 I 1 I Utihcion de la Cap&dad (W)<br />

10 20 30 40 50 60 70 80 90 100 Capacity Utilisation (%)<br />

Figura 1.<br />

Flgure 1.<br />

Planeamiento de1 Sistema first function to make contact with the local plan-<br />

ners or initiators. In order to transfer technology<br />

Por lo general, para estos primeros sistemas <strong>com</strong>- it is necessary to have a customer, a manufac-<br />

unitarios la capacidad de la unidad de energia sera turer and a supplier. At stage one, several of<br />

entre 10 y 50 kW. Se utilizan voltajes de distribution these jobs may be <strong>com</strong>bined. For example, ITDG<br />

normales de baja tensidn porque 10s transformadores may also be the supplier and the local planners<br />

de alta tensi6n aumentarian el costo a un porcentaje may aIs0 be the first custofiiei. There will in any<br />

no aceptable. DOS transformadores de 30 BVA, 11 kv case be linkages between all parties. At stage<br />

costatian aproximadamente lo mismo que un two, which can be referred to as training and<br />

generador de 30 kVA. extension, the linkages change so that those<br />

Esto implica que la distribucih de la energia between the customer, manufacturer and sup-<br />

estatia limitada aproximadamente a un petimetro de pliers get stronger and those between lTDG and<br />

2 km de la casa de mhquinas. Por la misma raz6n no the local planner change emphasis towards train-<br />

se planea almacenaje de agua. No obstante, por ing and end use development. The final stage is<br />

causa de que no se conoce el patr6n de desarrollo de one of steady state, i.e. where the system is no<br />

la carga, el canal de alimentacion la tuberia de longer changing. In this case, the links with ITDG<br />

presi6n debera tener capacidad suficiente para que el are finished; the links between customer,<br />

flujo de1 agua de la turbina a la casa de maquinas installer, manufacturer and suppliers are well<br />