A objet0 de hallar soluciones positivas a la<br />

situation energetica nos hallamos analizando<br />

resultados obtenidos por el Servicio <strong>National</strong> de<br />

Meteorologia e Hidrologia, ya que esta entidad cuen-<br />

ta con estaciones hidrologicas en algunos de 10s prin-<br />

cipales rios, cuyos recursos se puede aprovechar para<br />

la generation hidroelectrica. Asi se cuenta con el<br />

siguiente ndmero de estaciones.<br />

La Paz 60 estaciones<br />

Cochaba.mba 50 estaciones<br />

C huquisaca 18 estaciones<br />

Santa Cruz 21 estaciones<br />

Tarija 18 estaciones<br />

Oruro 9 estaciones<br />

pot.osi 7 estaciones<br />

Total 183 Estaciones<br />

Y algunas otras recientemente instaladas<br />

Aspectos Complementarios<br />

Dentro de las areas hidrogaficas existen gran can-<br />

tidad de poblaciones pequefias situadas en zonas<br />

aledanas a rios principales o tributarios de 10s<br />

sistemas de1 pais que a su vez se hallan alejados de<br />

10s sist.emas electricos existentes.<br />

El momento actual exige el aprovechamiento de<br />

recursos energeticos no explotados. Para este <strong>com</strong>-<br />

etido debe hallarse una solution que satisfaga las<br />

necesidades emergentes y este acorde con las<br />

disponibilidades economicas de1 pais. Por esta razon<br />

las Instituciones <strong>com</strong>prometidas en la solution de<br />

estos problemas se estin elaborando politicas que<br />

conjuncionen criterios ticnicos y economicus. Dentro<br />

de e&as alternativas se plantean criterios tales <strong>com</strong>a<br />

la estandarizacion de 10s sistemas.<br />

La experiencia en la electrification de poblaciones<br />

menores permite establecer limites de potencia a in-<br />

stalarse en funcion de la importancia, ntimero de<br />

habitantes, proyeccion de la demanda y otros<br />

parametros. Con estas bases estimamos <strong>com</strong>a conve-<br />

nientes centrales de1 orden de 20, 50, 100, 200 y 500<br />

kV que pueden ser micro centrales hidroelectricas es-<br />

tandarizadas de modo que puedan ser adoptadas para<br />

diferentes alturas de caida y caudales de agua con<br />

pequenas modifica&ones de sus <strong>com</strong>ponentes y con el<br />

aprovechamiento de recursos economicos.<br />

Ademas se estima conveniente la posibilidad de<br />

proyectar casas de maquinas, canales, camaras de<br />

carga, tuberfas y otros de tipo estandarizado y recur-<br />

riendo a tecnicos y materidles con menos frecuencia.<br />

Chuquisaca<br />

Santa Cruz<br />

Tari ja<br />

Oruro<br />

Potosi<br />

Total<br />

18 stations<br />

21<br />

18<br />

0<br />

7<br />

183 Stations...and some<br />

recently installed.<br />

Complimentary Facts<br />

Within the hydrographic areas, there are a<br />

great number of small towns located in areas ad-<br />

jacent to main rivers or tributaries which, as we<br />

have already stated, are far from existing elec-<br />

trical systems.<br />

The times tail for full use of non-exploited<br />

energy resources and for that purpose a solution<br />

should be found which would satisfy emergency<br />

needs and which would be in step with the coun-<br />

try’s available economic resources. For this<br />

reason, policies are being formulated within the<br />

organizations involved in the solution of these<br />

problems, which would agree with technical and<br />

economic criteria. Within these, alternative<br />

criteria such as standardization of the systems<br />

are under consideration.<br />

Experience in the electrification of small towns<br />

allows us to establish capacity limits to be in-<br />

stalled according to their priority, number of in-<br />

habitants, projected demand and other<br />

parameters. With this data, we estimate standar-<br />

dized hydroelectric powerplants of 1, 20, 50, 100,<br />

& 500kW which can be standardized according to<br />

varying heads, water supply, etc. with small<br />

modifications of their <strong>com</strong>ponents taking full ad-<br />

vantage of economic resources.<br />

Furthermore, the possibility of planning<br />

powerhouses, channels, load chambers,<br />

penstocks, etc. of standardized type, making less<br />

frequent use of technicians and materials is<br />

deemed appropriate. At the same time,<br />

automated systems of non-sophisticated types<br />

are available which can be operated by non-<br />

speciaiized personnel. In sum, we propose to use<br />

all means with the object of minimizing construc-<br />

tion costs and reducing the high cost of pertinent<br />

engineering studies.<br />

By way of <strong>com</strong>plementary information, based<br />

in some projects of small hydroelectric plants<br />

presently under way and others planned, con-<br />

struction costs in Bolivia are 1,500 $US per kW<br />

installed, which implies channel construction of