Por ejemplo, se puede tener unit miniregion<br />

susceptible de ser eiectrificada mediante cual-<br />

quiera de las dos siguientes alternativas:<br />

/r-a. Alternativa - Un solo pequeno sist’ema<br />

--<br />

A--<br />

kW = MDA + MDB<br />

LAB em)<br />

A mini-region may be electrified by either<br />

of the following two alternatives:<br />

1st Alternative - Only one small system<br />

Grupo A de localidades Grupo B de locahdades<br />

MDA (incluye perdidas) MDB (incluye perdidas)<br />

Group A of <strong>com</strong>munities<br />

MDA (includes losses)<br />

CP1 = Costo promedio de la energia<br />

en la primera alternativa<br />

(ctvo. US$/kVh).<br />

Aproximadamente:<br />

cpl = CG(AB) + CST(AB),L~ + CST(B),I,m x<br />

MDB<br />

(MDA + MDB)<br />

Siendo:<br />

CG(AB)<br />

CST(AB),L* =<br />

CST(B),Lm =<br />

MDA<br />

MDB<br />

= Costo de generation de<br />

enerda, para la suma de las<br />

demandas (MDA = MDB) y<br />

para la distancia LA<br />

Costo de subtransmisidn de<br />

energfa para la suma de<br />

demandas (MDA + MDB) y<br />

para la distancia LA<br />

Costo de substransmision de<br />

energi para la demanda MDB<br />

y para la distancia LAB.<br />

= Maxima Demanda proyectada<br />

de1 Grupo A de localidades<br />

otw)<br />

= MSxima Demanda proyectada<br />

de1 Grupo B de localidades<br />

WV<br />

298<br />

Group 6 of <strong>com</strong>munities<br />

MDB (includes losses)<br />

CP1 = Average cost of energy under first<br />

alternative (cents USlkWh)<br />

Approximately:<br />

CPA = CG(AB) + csv(AB),LA + CST(B), LAB x<br />

MDB<br />

(MD + MDB)<br />

where:<br />

CG(AB) = Cost of energy generation,<br />

for the sum of demands<br />

(MDA + MDB)<br />

CST(AB),LA = Cost of subtransmission<br />

energy for the sum of<br />

of<br />

demands (MDA + MDB) and<br />

for the distance LA<br />

CST(B), LAB = Cost of subtransmission of<br />

energy for demand MDB<br />

and distance LAB.<br />

MDA = Maximum projected demand<br />

for Group A of <strong>com</strong>munities<br />

(kW)<br />

MDB = Maximum projected demand<br />

for Group 3 of <strong>com</strong>munities<br />

(kW)