100 kW<br />

Las unidades generadoras y aistemas de<br />

distribucih de 50 kW o m&s, son por lo general<br />

sistemas trifhicos. Cuando el centro de carga esti a<br />

mayor distancia que 1 km de1 lugar de generazih, el<br />

voltaje se podr5 aurnentar a un voltaje de<br />

distribucih standard para yeducir las phrdidas de<br />

energia en el conductor y la &da del voltaje en<br />

Greas remotas. Las lheas monofhicas sirven directa-<br />

mente a 10s transformedores secundarios y deben<br />

todos acarrear aproximadamente carga igual para<br />

que las tres fases se mantengan en equilibrio. La pro-<br />

teccih de1 alimentador primordial se coordina con<br />

las tapas de 10s fusibles de mode que las fallas de las<br />

lheas de las tapas no vayan a interrumpir el servicio<br />

en el resto de?, sistema.<br />

f-<br />

fuente alternativa<br />

alternate source<br />

===u<br />

\ ‘\<br />

alimentador primario<br />

A simple nlsthod for integrating a small<br />

hydropower unit with an existing electric system<br />

is to isolate a portion of the load on the existing<br />

system and serve it solely from the hydro station.<br />

To do this, the station must have a synchronous<br />

generator. A normally-open switch could be<br />

closed to serve this isolated load from the ex-<br />

isting source during periods when the hydro unit<br />

is shut down. An interlock ensures that the<br />

switch would not close while the generator is<br />

operating. This arrangement is shown in Figure 3.<br />

Many existing distribution lines are protected<br />

by reclosers which respond to faults by briefly<br />

de-enargizing the line, and then reclosing to<br />

restore service in the likely event that the fault<br />

was temporary. This operation may be repeated<br />

R c- 100 kW; 443 kV; 30<br />

Figura 3<br />

Figure 3<br />

tranformador de la estacih<br />

station transformer<br />

L--<br />

10 hea monof5sica<br />

transformador de distribucih<br />

distribution transfoimer