digmetro con toma lateral simple. El cliente era una<br />

<strong>com</strong>pama minera que tenia taller es de reparation.<br />

Las caner&s de presidn eran de 5 pies de diametro,<br />

casi vertical y soportada con pilares de concrete<br />

cruzados por dos vigas en I de 24 pulgadas en<br />

tramos de 14 pies.<br />

Coloque indicadores en la caja de engranajes para<br />

tomar lecturas en la caja de la turbina. Luego se<br />

puso un bloque a la rot&on de la turbina y se hen6<br />

la cafietia de preaion y el encasillado de presion. La<br />

caja de la turbina se movid 105 milesimos de una<br />

pulgada con respect0 a la caja de engranajes. El<br />

sistema en si carecia rigidez.<br />

Solucih. Se orden 5 un rodamiento de empuje<br />

para el generador y se lo monto verticalmente. Se in-<br />

stale un rodamiento Timken Roller para el eje de cola<br />

en el eje de la turbina y se instalaron guias in-<br />

dustriales con bandas en V de 150 HP. usando<br />

repuestos que el cliente tenia disponibles guias Ball-<br />

Mill. La unidad ha e&ado en operation ahora por<br />

algo m&s que tres anos sin mas problemas.<br />

Un Comentario. Es probable que este sistema<br />

pudiera haber sido reforzado para controlar las<br />

deflecciones que estaban perjudicando la caja de<br />

engranajes. El element0 de1 tiemgo determine que se<br />

deberia hater. La causa de1 da.iio fue la falla de<br />

suministrar soporte para la can&a de presion.<br />

El cliente fue una <strong>com</strong>pania americana de produc-<br />

cion de papel que generaba su propia energia con un<br />

par de turbinas Kaplan a eje vertical. Durante el<br />

pen’odo de suficiente abundancia de1 agua, operaban<br />

ambas unidades y generaban muy poca electricidad a<br />

vapor. Durante el verano, operaban solo una unidad<br />

y cerraban la otra. Como tres anos despues de<br />

empezar, mientras una unidad estaba en operation,<br />

un rayo cay6 sobre la linea entre la planta de ener@a<br />

y la fabrica de papel. el dano fue confinado a la<br />

arana y las ilaves que unian el generador en forma<br />

de paraguas al eje vertical de la turbina. La unidad<br />

de reserva estaba funcionando cuando llegue a la<br />

planta.<br />

Solucibn:<br />

Se two que reemplazar la arana y esto tom6 todo<br />

el resto de1 verano. Para el otono ambas unidades<br />

estaban operand0 y funcionaron durante todo el in-<br />

vierno. Los calculos hechos con respect0 a la araiia<br />

que fall6 no revelaron las debilidades de1 diseno. Nos<br />

dimos cuenta de que las energias generadas por el<br />

rayo podrian volver a ocurrir. Re<strong>com</strong>endamos que<br />

165<br />

be left “on-line” during the summer with one ac-<br />

ting as a synchronous condenser.<br />

Two years after the procedure had been<br />

adopted, lightning again struck the system. This<br />

time the bolt was more powerful than earlier and<br />

some synchronous motors in the mill were<br />

damaged, but the hydro units were fine. If you<br />

have lightning, remember this!<br />

Looking Ahead<br />

There is no doubt in the speaker’s mind that<br />

one day we are going to have to recover all<br />

renewable energy forms. Here are some do’s and<br />

dont’s for your consideration.<br />

DO<br />

1. Make your take-off canal large enough to<br />

carry all of the water in the mainstream, at<br />

least up to twice what you need at the pre-<br />

sent. At the very least, this will reduce the<br />

velocities so that you will be running cleaner<br />

water in the beginning.<br />

2. When you construct the forebay, try to plan<br />

one connection which may be only a wooden<br />

plank poured into the wall, with a steel plate<br />

over the inside to prohibit failure. Someday<br />

someone will be glad you thought of him. (It<br />

may be you).<br />

3. Select standard generation voltages for<br />

future connection to some future network.<br />

Make room in your control panel for<br />

automatic synchronizing equipment.<br />

4. Plan your transmission links so that, by<br />

changing voltage in the future, you can move<br />

more renewable power to more people.<br />

5. Don’t foreclose your options on many small<br />

hydro units by the philosophy of large<br />

development only. As an example, the U.S.<br />

fueled it’s industrial revolution with<br />

renewable energy hydro and many of these<br />

smaller (100 to 1000 kW) units are being<br />

restarted today in the U.S.<br />

DON’T<br />

1. Don’t forget that, in some locations, hydro<br />

power is seasonal. This does not rule out<br />

certain uses for this power that may coin-<br />

cide with the energy availability. For exam-<br />

ple, the heating season, at some altitudes, in<br />

your countries may fit well with the run-off<br />

season.