2.5.4 Capacidad en el ambito nacionai de1<br />

suministro de materiales y equipcs y la<br />

capacidad de construcci6n.<br />

Minicentrales Hidroelbctricas<br />

Rango de Potencias<br />

La mayon’a de las miniregiones donde se preve la<br />

construcci6n de Minicentl ales, tienen unit demanda<br />

m&xima de potencia proyectada hasta 1000 kW. Sin<br />

ser limitativo, las centrales tendrgn, en general,<br />

potencias inferiores a esta capacidad. Es conveniente<br />

estandarizar las potencias de 10s equipos *y facilidades<br />

de mantenimiento, sin embargo debe evitarse<br />

escalones apreciables en 10s rangos de potencias a<br />

estindarizarse. Es aconsejable estandarizar potencias<br />

en funci6n de las capacidades de 10s recursos hidricos<br />

y de las demandas proyectadas de potencia de las<br />

miniregiones. Se debe estudiar cual es el orden de<br />

demanda m8s reeptitivo en las miniregiones.<br />

Inversionea<br />

Las inversiones requeridas para la construcci6n de<br />

minicentrales es muy variable, en funci6n de las<br />

caracten’sticas y necesidades de obras civiles de cada<br />

proyecto. El cost0 de 10s equipos en general es m&s<br />

determinado, dependiendo de su calidad ticnica y<br />

procedencia. Se puede mencionar referencialmente,<br />

que ei costo direct0 vatia entre 1,600 US$/kW B<br />

1000 US$/kW para centrales de 50 kW 2 1000 kW<br />

de potencia instalada.<br />

Las inversiqnes en lineas de subtransmisibn aunque<br />

variables de acuerdo a la topografia de1 terreno, son<br />

de m8s f&i1 estimacibn. El costo direct0 para las<br />

lineas de 13.2 kV (6 10 kV) vatia de 3,300 US$/km<br />

para <strong>com</strong>ductor AASC No. 6 AWG 5 10,790 US$/km<br />

para conductor AASC 4/O AWG. Es necesario<br />

elaborar un Plan de Minicentrales pera determinar<br />

las inversldnes requeridas en este programa. Sin em-<br />

bsrgo, existen proyectos para su pronta implemen-<br />

tacibti.<br />

Cost0 dc hergia<br />

No obstante ser las Minicentrales Hidroel&tricas la<br />

mejor aiterr ; ,;iva de suministro de energia para las<br />

Miniregiom? sin posibilidades de interconexien a<br />

sistemas el&tricos de media,i:;i en&n existentes, el<br />

costo de la energia es alto principalmente debido al<br />

bajo consumo de 10s pobladores rurales. POT- este<br />

moi;ivo es necesario consttir obras a minim0 costo y<br />

promover el consume.<br />

El costo $2 ener@a es superior en centrales rngs<br />

pq&& y &minuyp nara rontrabc m54wwac Par !e<br />

r-’ - --.. “--a-- “‘.“L’ “L VU.<br />

tanto se debe tratar de utilizar al mtiimo lineas de<br />

substransmisi6n para abastecer el mayor ndmero de<br />

MinihydroePectsic Powerplants<br />

Range of Power<br />

The majority of the mini-reglsns where con-<br />

struction of minihydroelectric power plants is<br />

foreseen have a maximum projected power de-<br />

mand of up to 1000 kW. Without this being<br />

restrictive, most of the stations will have a<br />

dapacity below this power. It is convenient to<br />

standardize the capacity of the equipment and<br />

maintenance facilities, however, the range of<br />

powerplants to be standardized should be kept<br />

small. There is a need to research the most <strong>com</strong>-<br />

mon order of demand in the mini-regions.<br />

Investments<br />

The investments required for the construction<br />

of ministations varies a lot as a function of the<br />

characteristics of the civil works of each project.<br />

The cost of equipment in general is more stable,<br />

depending on the technical quality and country<br />

of origin. It may be mentioned for reference pur-<br />

poses tnat the direct cost will vary from<br />

U$S1,600/kW to U$Sl ,OOO/kW of installed capaci-<br />

ty for stations from 50 kW to 1,000 kW.<br />

Even though the investment in subtransmis-<br />

sion lines varies depending on the topography of<br />

the terrain, is easier to estimate. The direct cost<br />

for lines of 13.2 kV (or 10 kV) varies from<br />

U$S3,300/km fro ACSR No. 6 AWG conductor to<br />

U$S10,790/km for ACSR 410 AWG. It is necessary<br />

to design a plan for ministations to determine the<br />

investments required in this program. However,<br />

there are projects for implementation in the near<br />

future.<br />

Energy Cost<br />

Mini-hydroelectric power pla;lts are the best<br />

alternative for energy supply to those miniregions<br />

that have no possibility of interconnection<br />

to existing electric systems of medium<br />

voltage. However, the cost is high, mainly due to<br />

the low level of use by the rural population. For<br />

this reason, it is necessary to build minimum<br />

cost installations and to promote consumption.<br />

The energy cost is higher at smaller stations<br />

and it decreases for higher capacity stations.<br />

Therefore, an effort should be made to optimize<br />

the use of subtransmission lines to supply the<br />

largest number posslb!e of ,““UII.I”” In~slitin~ +rfim ll”lll u *<br />

single station. The cost of subtransmission is<br />

much lower than the cost of generation. From<br />