Segundo es m&s adecuado para el desarrollo de las<br />

redes y subestaciones de 10s sistemas y el tercero por<br />

el hecho de ser una aportacidn directa de1 mismo con-<br />

sumidor, tiene psicologicamente un derecho a ser<br />

retribuido con la misma instalacidn de servicio que<br />

constituye algo tangible y personal.<br />

De alli que <strong>com</strong>a conclusion sobre la posibilidad de<br />

otra Fuente de Recursos Financieros, podemos<br />

advertir que para un programa de mini-centrales y<br />

de pequefio tamaiio, la contraparte local a ser<br />

obtenida por metodos indirectos <strong>com</strong>a 10s arriba in-<br />

dicados no parece ser suficiente, por lo que deberia<br />

buscarse para este programa la maxima financiacion<br />

externa tanto para el equipo, <strong>com</strong>a para las obras<br />

civiles.<br />

Para tener una idea de la magnitud de1 costo actual<br />

de centrales de mediano tamtio vamos a detallar a<br />

continuation las caracteristicas principales y costos<br />

de1 equip0 y obras civiles de cinco cent&es que IN-<br />

ECEL tiene en estudio preliminar, con grupos de<br />

capacidades entre 2.500 y 400 kW.<br />

Estos costos dan un valor por kW instalado de<br />

US$1.192; 1.466; 1.920; 2.200 y 2.700 respectiva-<br />

mente, lo que indica un fuerte encarecimiento de las<br />

obras conforme disminuye la capacidad de la central,<br />

advirtiendose adem& que el rubro que encarece la<br />

Localidad<br />

Town<br />

Provincia<br />

Province<br />

Rio<br />

River<br />

Altura<br />

Elevation<br />

Caudal Desviado<br />

Diverted Flow<br />

Caida Bruta<br />

Gross Head<br />

Capacidad Instalada<br />

Installed Capacity<br />

Toma<br />

Intake<br />

Tipo<br />

Type<br />

Altura<br />

Height<br />

Longitud<br />

Length<br />

Bocatoma<br />

Entrance<br />

Dist. Bet. Spans<br />

Dist. Bet. Spans<br />

Morona-Santiago<br />

Abanico<br />

1,440 m<br />

6.5 mslsec.<br />

95 m<br />

2 x 2,500 kW<br />

Direct0<br />

Direct<br />

4 vanes<br />

4 Spans<br />

2.5 m<br />

Tena<br />

Napo<br />

Misa Hual LI<br />

630 m<br />

10 ms/sec.<br />

2 x 1,500 kW<br />

Dique de Desvfo<br />

Diversion Dam<br />

3m<br />

140 m<br />

5 Vanos<br />

5 Spans<br />

2.8 m<br />

Of the three funds mentioned above, it appears<br />

that the first may be the only one applicable as<br />

counterpart in mini and small powerplant con-<br />

struction programs, since the second is more ap-<br />

propriate for the development of grid systems<br />

and substations, and the third, since it<br />

represents a direct contribution from the con-<br />

sumer, appears at least psychologically earmark-<br />

ed for reinvestment in the installation of services<br />

which constitute a tangible and personal benefit<br />

for the consumer.<br />

In conclusion, as regards the possibility of us-<br />

ing another source of financial resources for a<br />

mini and small powerplant construction program,<br />

the local coun;erpart obtainable through indirect<br />

methods such as those mentioned above does<br />

not appear sufficient. For this reason, maximum<br />

external financing should be sought for this pro-<br />

gram both for equipment and for civil works.<br />

To give an idea of the magnitude of current<br />

costs of medium-sized powerplants, we detail<br />

below (Figure 1) the main characteristics and<br />

costs of equipment and civil works for five<br />

powerplants that INECEI.. has under preliminary<br />

consideration, with groups ranging in capacity<br />

from 400 to 2,500 kW.<br />

Pangua-El Corazon<br />

cotopax 1<br />

Angamarca<br />

580 m<br />

2 mQsec.<br />

60 m<br />

2x50kW<br />

Vertedero<br />

Spillway<br />

3.5 m<br />

18 m<br />

5 Vanos<br />

5 Spans<br />

1.2 m<br />

Sucumbios<br />

Napo<br />

Lunbaqui<br />

480 m<br />

1.2 m3/sec.<br />

40 m<br />

1 x 400 kW<br />

Dique de De&o<br />

Diversion Dam<br />

2m<br />

25 m<br />

4 Vanos<br />

4 Spans<br />

I.2 m<br />

Figura 1 Caracteristicas de AJgunos Proyectos Pequeiios de Hidroelectricidad<br />

Figure 1 Characteristics of Some <strong>Small</strong> Hydro Projects<br />

281<br />

Zumba<br />

Zamora Chincipe<br />

Isi Man&i<br />

800 m<br />

2.6m3lsec.<br />

1 x 400 kW<br />

Dire&o<br />

Direct