2. Costs include a turbine with adjustable runner blades and adjustable wicket gates, synchronous<br />

generator, speed regulating governor and installation.<br />

i. ? Inatallatinn __.__-.. .d..VB? c.r;st.s ar2 _ eStiE?2!cd at $ECj,Q>t for the &rge ijnffs, to $75,600 for the sma!! units.<br />

4. For fixed blade units, deduct 10% of total cost.<br />

5. The cost of a rim turbine<br />

6. Cost base is July 1976.<br />

is approximately the same as a bulb turbine.<br />

Caida Efectiva de la Twbina<br />

Turbine Effective Head<br />

I; 2bm<br />

Figura 7 Costos de Turbina de Flujo Transversal<br />

Figure 7 Crossflow Turbine Costs<br />

Notas:<br />

1. Costos estimativos basados en una turbina tipica de flujo transversal acoplada al generador par medio de<br />

ux incrementador de veiocidad.<br />

2. Los costos incluyen una turbina, generador sincronizado, incrementador de velocidad, v&ula de in-<br />

greso, regulador sin regulador de velocidad e instalacibn.<br />

3. Agregar $60,000 para cubrir el regulador de velocidad.<br />

4. B&e de costo a julio 1978, preparado por Tudor Engineering Co.<br />

Notes:<br />

1. The estimated costs are based upon a typical crossflow turbine coupied to the generator<br />

through a speed increaser.<br />

2. Costs include a turbine, synchronous generator, speed increaser, inlet valve, non speed<br />

regulating governor and installation.<br />

3. For speed regulating governor, add $60,000.<br />

4. Cost base is July 1978.