Base de Costo por Kilometro 14.4124.9 kV Construccih Urbana<br />

Base Cost per Kilometer 14.4124.9 kV<br />

Urban Construction<br />

30 alimentadores principales usados por circuitos de distribucih en centros urbanos. Promedio de un paste<br />

por cada 50 metros para a<strong>com</strong>odar 10s alambres de servicio.)<br />

(Main 30 feeders used for distribution circuits in urban centers. Average of one pole per 50 meters to<br />

a<strong>com</strong>modate service drops.)<br />

Cost0<br />

Cost0 Unit&o<br />

Unitario Mano de Obra Cost0<br />

Cantidad Descripch de1 Material y Otros Total<br />

Unit Cost Unit Cost Total<br />

Quantity Description Material Labor & Other cost<br />

20<br />

17<br />

2<br />

1<br />

3000M<br />

1OOOM<br />

2<br />

2<br />

17<br />

3<br />

20<br />

11 Postes de<br />

Medidores<br />

Meter Pole<br />

vc-1<br />

vc-2<br />

VC-8<br />

D-110 ACSR<br />

D-4 ACSR<br />

VE l-3<br />

F l-3<br />

VM 2-12<br />

VM 2-11<br />

VM lo-15<br />

47.23 41.81 1780.80<br />

24.95<br />

54.29<br />

88.96<br />

1.164<br />

1.098<br />

9.76<br />

4.65<br />

5.48<br />

4.55<br />

1.43<br />

Tabla 3<br />

Table 3<br />

21.86<br />

47.51<br />

77.87<br />

0.164<br />

0.098<br />

8.57<br />

22.41<br />

4.81<br />

10.51<br />

1.30<br />

795.77<br />

203.60<br />

166.83<br />

984.00<br />

196.00<br />

36.66<br />

54.12<br />

174.93<br />

45.18<br />

54.60<br />

4492.49<br />

Estoa y otros estimativos de costo bhico se in- . Systems with service areas of adequate area,<br />

cluyen en la Tabla 5 que indica el costo total population and load potential for an<br />

estimativo para servir un sistema tipico de 14.4/24.9 economically effective operation.<br />

kV que tenga un alimentador principal trifhico<br />

km y sirva a 500 consumidores.<br />

de 10 0 A professional full-time management staff.<br />

0 A continuing source of appropriate long-term<br />

Las Tablas 3, 4 y 5 vienen de un reporte preparado capital financing for system growth to meet<br />

por NRECA para el Grupo de1 Banco Mundial the total needs of the area.<br />

227