ella esti en manos de funcionarios celosos de la pro-<br />
piedad institutional. En nuestro case, varios meses<br />
han transcurrido antes de poder disponer de la infor-<br />
macion b&ica, la misma que debemos elaborarla para<br />
poder utilizaria. El tipo de information que hemos re-<br />
querido es la correspondiente a la hidroldgica y<br />
meteorologica de las diversas regiones.<br />
Como lo hemos anotado anteriormente, el pro-<br />
grama ha sido dividido en un bioque de reubicacidn y<br />
otro de instalacion de nuevas centrales. En el un<br />
case ha sido necesario realizar unit encuesta para<br />
determinar las caracteristicas de 10s equipos ex-<br />
istentes, trabajo que ha sido realizado par la Division<br />
de Electrificaci6n Rural de INECEL; en el otro, de<br />
las nuevas centrales, hemos recurrido a 10s<br />
fabricantes y proveedores de equipos.<br />
El problem Glgido de esta fase de investigation<br />
preliminar es el de la definition de prioridades.<br />
Evidentemente, la demanda de servicio es mayor que<br />
la capacidad fisica y economica de1 programa, motivo<br />
por ol cual ha sido necesario establecer criterios que<br />
ayuden a la selection de 10s proyectos que seran<br />
atendidos. Desde el punto de vista de 10s usuarios ex-<br />
igimos la implementation de una organization de la<br />
<strong>com</strong>unidad y la formulation de programas de desar-<br />
rollo. Estas exigencias nuestras deben incidir in-<br />
clusive en 12 modification de <strong>com</strong>portamientos<br />
sociales pues 10s dirigentes y lideres de las <strong>com</strong>-<br />
unidades deberan pensar en proponer programas<br />
<strong>com</strong>pletes de trabajo y <strong>com</strong>prometerse a llevarlos 2<br />
cabo cuando cuenten con el poder de decision que lo<br />
permita.<br />
El criteria en cuanto al recurso se refiere consiste<br />
en la verificacidn de la existencia de1 minim0 in-<br />
dispensable para llevar a cabo las necesidades<br />
programadas.<br />
Investigacih Thnica<br />
La secuencia logica de la etapa anterior, en la cu21<br />
hemos definido 10s lugares que ser&n atendidos con<br />
nuestros proyectos, es la de conception y dimensiona-<br />
miento de las obras. Como primera actividad basica<br />
hemos previsto la elaboration de un manual de<br />
disefio y de normas de construcion. Nuestra idea es<br />
la de estandarizar criterios que nos permitan simpli-<br />
ficar, de acuerdo a las caractetisticas de cada proyec-<br />
to, 10s procesos de estudio. Asi, es necesario<br />
establecer una metodologfa de estudios de la<br />
hidrologia de 12 zona que obedezca a las dimensiones<br />
Rural Marginal (FODERUMA) en el cual nuestra<br />
precision de 10s resultados concordante con 12<br />
new installations. In the first case, we made a<br />
survey to determine the characteristcs of the ex-<br />
isting equipment. This was performed by the<br />
Rural Electrification Division of INECEL. In the<br />
other case, the new installations part of the pro-<br />
gram, we requested information from manufac-<br />
turers and equipment suppliers.<br />
A big problem encountered in the preliminary<br />
phase is the determination of priorities. Bbvious-<br />
ly, the demand for service is greater than the<br />
physical and economic capability of the program.<br />
For this reason, we established criteria to<br />
prioritize the projects selected. From the con-<br />
sumer standpoint, we require a <strong>com</strong>munity<br />
organization and a development program, in-<br />
cluding modification of social behavior. This will<br />
require that <strong>com</strong>mu “y leaders develop pro-<br />
posals for <strong>com</strong>plete programs and <strong>com</strong>mit<br />
themselves to implementation as soon as they<br />
have the means for decisionmaking.<br />
in terms of the resources, the criterion requires<br />
the verification of minimum resources to enable<br />
implementation of the program.<br />
Technical Research<br />
In logical sequence with the previous stage of<br />
prioritizing the projects, is the design of the in-<br />
stallations. As a key activity, we have provided<br />
for the preparation of a design and construction<br />
manual. It is our intention to establish standard<br />
criteria to simplify the process of studying each<br />
project in line with its individual characteristics.<br />
Thus, it is necessary to establish a methodology<br />
for the hydrological study of the area in line with<br />
the characteristics of the region. This will permit<br />
a degree of accuracy in the calculations con-<br />
gruent with the magnitude of the insta!lations<br />
and the quality of existing information.<br />
It is our intention to seek an adequate<br />
technology so the engineering work may be<br />
transformed into analytical labor, disregarding<br />
the routine cases. Therefore, we need to obtain a<br />
study and design package which may contain a<br />
<strong>com</strong>puter program to facilitate processing stan-<br />
dard solutions in line with the individual<br />
characteristics if each project. The solutions<br />
should optimize the utilization of resources and<br />
be harmonious with the local infrastructure.<br />
Another important aspect is the equipment<br />
study to define the distinction between relocation<br />
and new installations. In the relocation projects,<br />
there is a need to establish minumum investment<br />
criteria and <strong>com</strong>patibility with the demand condi-<br />
268