Otros Equipos de Distribucih<br />

Para reducir al minim0 10s problemas de corrosi6n<br />

por debajo de1 nivel de1 suelo, se re<strong>com</strong>ienda el use<br />

de varillas de acero galvanizado para el suelo y<br />

varillas de anclaje.<br />

Los medidores para el consumidor aumentan el<br />

costo total de1 proyecto y a veces algunos sistemas<br />

rurales han operado sin ellos. En tales cases, cada<br />

consumidor de1 sistema paga una tarifa mensual<br />

standard sin tomar en consideracibn la cantidad de<br />

ener@a utilizada. Eventualmente, unos pocos con-<br />

sumidlores mayores podrian utilizar la mayor parte de<br />

la energia de1 sistema, y, en efecto, son subven-<br />

cionados por 10s otros consumidores. Para evitar esta<br />

desigualdad, re<strong>com</strong>endamos que se instalen<br />

medidores para 10s consumidores.<br />

Se re<strong>com</strong>ienda usar medidores encasillados<br />

disefiados para instalaciones al aire libre para<br />

eliminar la necesidad de construir una caja im-<br />

pern,eaSle para protejer el medidor.<br />

Un beneficio adicional de estos medidores es la<br />

facilidad para desconectar eL case de falla en el pago<br />

de las cuentas. En lugar de desconectar 10s cables de1<br />

servicio de !a linea secundaria, que necesita un<br />

operador, se puede aislar el medidor mediante una<br />

tapa de pl&tico qae cllesta menos de U$SO.lO el par,<br />

y este procedimiento puede ser ejecutado con<br />

facilidad y sin riesgo, por un empleado de la<br />

<strong>com</strong>pafiia de electricidad.<br />

A medida que el sistema se torna financialmente<br />

fuerte, 10s ingresos de las extensiones de la linea y el<br />

servicio a 10s consumidores individuales deben ser<br />

prorrateados con 10s ingresos de 10s consumidores<br />

existentes para asegurar que lcs promedios de1<br />

sistema siempre produzcan un margen positivo de<br />

opera&n. Por supuesto, esto diluirh el promedio de<br />

consumidores por transformador y por kildmetro de<br />

linea, pero 10s niveles de experiencia local permitirkn<br />

para entonces que la administracibn de1 sistema<br />

estabiezca sus propios criterios para evitar probleinas<br />

finaricieros de larga duraci6n. Creemos que 01 ob-<br />

jetivo final debera ser proveer servicios a toda el<br />

&rea.<br />

Sistemas de Diatribucih Tipicos<br />

Se presentan tres sistemas pequefios de<br />

distribucidn para democtrar el rango y grad0 de las<br />

facilidades de distribucibn requeridos por 10s proyec-<br />

tos de 10 kW, 100 kW and 1000 kW. Cada tamafio<br />

tiene sus propias caractetisticas e indicar6 la <strong>com</strong>ple-<br />

jidad y planeamiento requeridos para servir cargas<br />

de un sistema similar de hidroelectricidad mini/micro.<br />

than U.S. $0.10 per pair, and this procedure can<br />

safely be performed by any electric utility<br />

employee.<br />

As the system be<strong>com</strong>es financially strong,<br />

revenue from line extensions and service to in-<br />

dividual consumers should be averaged in with<br />

existing consumers’ revenue to assure that<br />

system averages will alwa.ys yield a positive<br />

operati,lg margin. This will, of course, dilute the<br />

average number of customers per transformer<br />

and per kilometer of line, but local experience<br />

levels will, by this time, enable system manage-<br />

ment to establish its own criteria for avoiding<br />

long-range financial problems. We believe the<br />

ultimate objective should be area coverage ser-<br />

vice to all.<br />

219<br />

Typical Distribution Systems<br />

Three small distribution systems are discussed<br />

to show the range and degree of distribution<br />

facilities required for projects of 10 kW, 100 kW<br />

and 1000 kW size. Each size has its own<br />

characteristics and will indicate the <strong>com</strong>plexity<br />

and planning required to serve loads from a<br />

similar mini/micro hydropower system.<br />

10 kW<br />

A 10 kW distribution system is small enough<br />

that secondary voltage circuits can handle the<br />

power outp~rt. Z+cause the unit is so small, the<br />

cost Pl$’ ?‘?,,-; 1.: r tFre i;ivi! tiorks, turbine, and<br />

gener&iol- wilE ifkely be quite high. Hence, “Ihe<br />

electrica; distribution should be as simple and<br />

cheap as possible Tho load center for this small<br />

system should be within one kilometer of the<br />

generator site to I/m!? the voltage drop. Sites of<br />

this potential size and with a load center greater<br />

than 1 km away are most likely to be unfeasible.<br />

100 kW<br />

Generating units and distribution svstems of<br />

50 kW or more are generally ttirPP pP&se<br />

systems. Where the load center is greater than 1<br />

km from the generating site, the voltage can be<br />

stepped up to a standard distribution voltage to<br />

reduce the energy losses in the conductor and<br />

the voltage drop in remote areas. Single phase<br />

lines serve secondary transformers directly and<br />

must all carry approximately equal loads for the<br />

three phases to be balanced. The primary feeder<br />

protection is coordinated with the tap fuses such<br />

that faults on the tap lines will not interrupt ser-<br />

vice in the remaining system.