Small Decentralized Hydropower Program National ... - Cd3wd.com
Small Decentralized Hydropower Program National ... - Cd3wd.com
Small Decentralized Hydropower Program National ... - Cd3wd.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Peso: X13<br />
El puntaje de 1 t; 10 otorgando m&s puntos a<br />
las miniregiones con m&s localidades.<br />
Es necesario fijar valores a 10s Pesos (Xl, debiendo<br />
ser de m&s o menos de acuerdo al siguierte<br />
ordenamiento:<br />
- Recuso hidrico y caracteristicas geologicas<br />
- Topogrfia de1 recurso hidrico<br />
- Poblacion Beneficiada<br />
- Densidad Poblacioual<br />
- Demanda de Potencia<br />
- Existencia y tipos de via de acceso a la<br />
miniregion<br />
- Existencia de servicio de agua potable<br />
- Tasa Ponderada<br />
- Sustitucion de energia tern-k<br />
- Acceso a la posible central<br />
- Topografia para lineas<br />
- TopograSia general de la miniregion<br />
Nlimero de localidades (poblaciones)<br />
ubicadas en la miniregion.<br />
De ser posible deben introducirse otros criterios<br />
<strong>com</strong>a es la production agropecuaria de cada region.<br />
La calificacion con esto criterios permitirg ::‘\a selec-<br />
cion de 10s proyectos. La calificacibn sera z ?esos x<br />
Puntajes. La selection de 10s proyectos deuey8<br />
hacerse en funcion de la calificacion y de 10s recursos<br />
economico financieros disponibles y de ejecucion de<br />
proyectos.<br />
Criterios para la Conformacih de1 Plan<br />
Como resultado de la evdluacion y selection de pro-<br />
yectos debe conformarse un Plan de Minicentrales<br />
Hidroelectricas, que en resumen sera una pro-<br />
gramacion en el tiempo de la construction de las<br />
mismas y de las asignaciones presupuestales cor-<br />
respondientes.<br />
Entre otros, 10s criterios principales son:<br />
2.5.1 Disponibilidad de recursos economicos y<br />
financieros, de las fuentes de Tesoro Ptiblico,<br />
Recursos Propios, Endeudamiento Interno y<br />
Externo.<br />
2.5.2 Resultado de1 reconocimiento en 4 campo de<br />
10s recursos hidricos y de las caractetisticas<br />
geol6gicas.<br />
2.5.3 Capacidad de la. Empresa para la direction<br />
y/o supervicion de la implementation de 10s<br />
proyectos.<br />
Weight XI3<br />
The score from 1 to IO will give the<br />
highest scores to the mini-regions having a<br />
higher number of <strong>com</strong>muniti,?s.<br />
It is necessary to set values for the weights (/o<br />
and they should follow the following order:<br />
- Hydro Resource and Geological<br />
Characteristics<br />
- Topography of the hydraulic resource<br />
- Population benefited<br />
- Population density<br />
- Energy Demand<br />
- Existence and type of roads accessibility to<br />
the mini-region<br />
--- Existence of drinking water service<br />
- Weighted rate of population increase<br />
- Substitution of thermal energy<br />
- Accessibility to the potential powerplant<br />
- Topography for the lines<br />
- General topography for the Mini-region<br />
- Number of localities (<strong>com</strong>munities) situated<br />
in the Mini-region.<br />
Whenever possible, other criteria, such as<br />
agricultural and livestock production, should be<br />
introduced. Screening for qualification with the<br />
use of these criteria will permit the selection of<br />
projects. The criterion will be 2: Wei@ts x<br />
Scores. The selec,tion of projects shouid be done<br />
as a function Oi ;he qualification and the<br />
economic and financiai resources a;!aitable to im-<br />
plement the projects.<br />
Criteria for the Design of 9 Plan<br />
As a result of the evaluation and selection of<br />
projects, there should be a plan of mini-<br />
hydropower plants which will represent a<br />
schedule for the construction of such plants and<br />
the corresponding budgetary allocations.<br />
Some of the main criteria area, among others:<br />
1. Availability of economic and financial<br />
resources, sources of public treasury, owned<br />
resources, internal or external loans.<br />
2. Results of the field reconnaissance of the<br />
hydraulic resources and the geological<br />
characteristics.<br />
3. Capabrlity for directing and/or supervising<br />
the project implementation.<br />
4. Availability within national limits of<br />
materiais and equipment supply and<br />
manufacturing capacity.