19.01.2013 Views

World Energy Outlook 2006

World Energy Outlook 2006

World Energy Outlook 2006

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 12.3: Natural Gas Liquefaction Plants to be Commissioned by 2010 (Continued)<br />

Country Operator Project name Status Online Capacity Cost<br />

(Mt/year) ($ million)<br />

Qatar Qatargas II (QPC, Ras Laffan (T1 & T2) Construction 2008 15.6 7 600<br />

ExxonMobil & Total)<br />

Qatar RasGas (QPC Ras Laffan (T5) Construction 2008 4.8 2 000<br />

& ExxonMobil)<br />

Qatar Qatargas III (QPC Ras Laffan (T3) Engineering 2009 7.5 6 500<br />

& ConocoPhillips)<br />

Qatar Qatargas IV (QPC Ras Laffan (T4) Engineering 2010 7.9 7 000<br />

& Shell)<br />

Qatar RasGas (QPC & Ras Laffan (T6 & T7) Construction 2010 15.8 7 000<br />

ExxonMobil)<br />

Russia Shell Mitsubishi Mitsui Sakhalin II Construction 2008 9.6 12 000<br />

Russia Tambei LNG Yamal Proposed 2010 3.5 1500<br />

Trinidad & Tobago Atlantic LNG Pomit Fortin (T5 &T6) Proposed 2010 6.0 5 000<br />

Venezuela PDVSA Shell Mariscal Sucre LNG Proposed 2010 4.8 2 700<br />

Yemen Yemen LNG Bal Haf Yemen LNG Construction 2009 6.2 3 000<br />

Chapter 12 - Current Trends in Oil and Gas Investment<br />

Planned, engineering and construction 166.8 73 350<br />

Proposed 59.2 25 900<br />

<strong>World</strong> 226.0 99 250<br />

Note: Proposed projects could slip beyond 2010 but are included here for the sake of completeness.<br />

Source: IEA database and analysis.<br />

339<br />

12<br />

© OECD/IEA, 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!