JSN C0037<br />

Name Rail, Apron, 4x36x1<br />

Logistical Category (LOGCAT) Fund Source Weights and Measures (Typical Only)<br />

Army A | Contractor Furnished, Contractor Installed<br />

Navy A | Contractor Furnished, Contractor Installed<br />

USAF A | Contractor Furnished, Contractor Installed<br />

VA A | Contractor Furnished, Contractor Installed<br />

IHS A | Contractor Furnished, Contractor Installed<br />

Utilities<br />

NSN 6530<br />

NOTE: Values shown are based on standard typicals used for programming purposes. <strong>The</strong> contractor remains responsible to<br />

develop and coordinate the design / construction in accordance with actual equipment selection.<br />

Utility1: Plumbing . |<br />

Volts1 0<br />

Utility2: Electrical . |<br />

Utility3: Med Gas . |<br />

Utility4: Misc Gas . |<br />

Utility5: Non-Med Gas . |<br />

Utility6: Misc . |<br />

Phase1 0<br />

Phase2 0<br />

Amps1 0<br />

Amps2 0<br />

Weight (lbs) 10 Weight (kgs) 5<br />

Height (in) 5 Height (cen) 13<br />

Width (in) 36 Width (cen) 91<br />

Depth (in) 1 Depth (cen) 3<br />

Volts2 0<br />

Hertz 0<br />

Hertz Dep 0<br />

Hertz Switch 0<br />

BTU / Hour 0<br />

Watts1 0<br />

Watts2 0<br />

Description<br />

Unit of Issue EA<br />

Group Fixed Casework<br />

Apron rail. Also referred to as an apron front, apron panel, or knee space rail. Used to close in front knee space area and/or provide work<br />

surface support between two base cabinets or a base cabinet and wall. Apron rails should be ordered in pairs to provide both front and<br />

rear work surface support.<br />

JSN C0038<br />

Name Rail, Apron, 4x42x1<br />

Logistical Category (LOGCAT) Fund Source Weights and Measures (Typical Only)<br />

Army A | Contractor Furnished, Contractor Installed<br />

Navy A | Contractor Furnished, Contractor Installed<br />

USAF A | Contractor Furnished, Contractor Installed<br />

VA A | Contractor Furnished, Contractor Installed<br />

IHS A | Contractor Furnished, Contractor Installed<br />

Utilities<br />

NSN 6530<br />

NOTE: Values shown are based on standard typicals used for programming purposes. <strong>The</strong> contractor remains responsible to<br />

develop and coordinate the design / construction in accordance with actual equipment selection.<br />

Utility1: Plumbing . |<br />

Volts1 0<br />

Utility2: Electrical . |<br />

Utility3: Med Gas . |<br />

Utility4: Misc Gas . |<br />

Utility5: Non-Med Gas . |<br />

Utility6: Misc . |<br />

Phase1 0<br />

Phase2 0<br />

Amps1 0<br />

Amps2 0<br />

Weight (lbs) 12 Weight (kgs) 6<br />

Height (in) 4 Height (cen) 10<br />

Width (in) 42 Width (cen) 107<br />

Depth (in) 1 Depth (cen) 3<br />

Volts2 0<br />

Hertz 0<br />

Hertz Dep 0<br />

Hertz Switch 0<br />

BTU / Hour 0<br />

Watts1 0<br />

Watts2 0<br />

Description<br />

Unit of Issue EA<br />

Group Fixed Casework<br />

Apron rail. Also referred to as an apron front, apron panel, or knee space rail. Used to close in front knee space area and/or provide work<br />

surface support between two base cabinets or a base cabinet and wall. Apron rails should be ordered in pairs to provide both front and<br />

rear work surface support.<br />

Thursday, April 21, 2011 <strong>MIL</strong>-<strong>STD</strong> <strong>1691</strong> | PPMD<br />

Page 96 of 1462

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!