14.06.2014 Views

Operating Manual EMI TEST RECEIVER ESIB7 - Rohde & Schwarz

Operating Manual EMI TEST RECEIVER ESIB7 - Rohde & Schwarz

Operating Manual EMI TEST RECEIVER ESIB7 - Rohde & Schwarz

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Configuration/Setup<br />

ESIB<br />

PHASE N<br />

PHASE L1<br />

PHASE L2<br />

Softkeys PHASE N, PHASE L1, PHASE L2 and PHASE L3 select the phase<br />

of the V-network on which the RFI voltage is to be measured.<br />

PHASE N<br />

PHASE L1<br />

PHASE L2<br />

RFI on phase N is measured,<br />

RFI on phase L1 is measured,<br />

RFI on phase L2 is measured<br />

(only for ESH2-Z5/ENV 4200),<br />

PHASE L3 RFI on phase L3 is measured<br />

(only for ESH2-Z5/ENV 4200).<br />

IEC/IEEE-bus command INPut:LISN:PHASe L1 | L2 | L3 | N<br />

PHASE L3<br />

PE<br />

GROUNDED<br />

PE<br />

FLOATING<br />

Softkeys PE GROUNDED and PE FLOATING switch the protective earth<br />

conductor chokes on or off.<br />

PE GROUNDED<br />

protective earth conductor choke switched off,<br />

PE FLOATING protective earth conductor choke switched.<br />

IEC/IEEE-bus command INPut:LISN:PEARth GROunded | FLOating<br />

1088.7531.12 4.36 E-15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!