ESIB- Receiver<br />

ESIB<br />

PRESCAN<br />

PHASES<br />

The PRESCAN PHASES and FINAL PHASES softkeys open the<br />

submenu for the selection of phase and protective earth setting.<br />

FINAL<br />

PHASES<br />

PRESCAN PHASES:<br />

FINAL PHASES:<br />

Softkeys ESH2-Z5/ENV 4200, ESH3-Z5<br />

and OFF or PHASE N, PHASE L1,<br />

PHASE L2 and PHASE L3 as well as PE<br />

GROUNDED and PE FLOATING are<br />

toggle keys. Only one of them can be<br />

activated at a time.<br />

All combinations of phases and PE<br />

setting are possible.<br />

PHASE N<br />

PHASE L1<br />

PHASE L2<br />

Softkeys PHASE N, PHASE L1, PHASE L2<br />

and PHASE L3 select the phase of the V-<br />

network on which the RFI voltage is to be<br />

measured.<br />

PHASE N<br />

PHASE L1<br />

PHASE L2<br />

RFI on phase N is measured,<br />

RFI on phase L1 is measured,<br />

RFI on phase L2 is measured<br />

(only for ESH2-Z5/ENV 4200),<br />

PHASE L3 RFI on phase L3 is measured<br />

(only for ESH2-Z5/ENV 4200).<br />

IEC/IEEE-bus command<br />

:INPut:LISN:PHASe L1| L2| L3| N<br />

PHASE L3<br />

PE<br />

GROUNDED<br />

PE<br />

FLOATING<br />

Softkeys PE GROUNDED and PE<br />

FLOATING switch the protective earth<br />

conductor chokes on or off.<br />

PE GROUNDED<br />

PE FLOATING<br />

protective earth conductor<br />

choke switched<br />

off,<br />

protective earth conductor<br />

choke switched<br />

on.<br />

IEC/IEEE-bus command<br />

:INPut:LISN:PEARth<br />

GROunded|FLOating<br />

1088.7531.12 4.110 E-15