04.02.2013 Views

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Regional</strong> <strong>Basic</strong> <strong>Professional</strong> <strong>Tra<strong>in</strong><strong>in</strong>g</strong> <strong>Course</strong> (BPTC) on Nuclear Safety<br />

Each dismantl<strong>in</strong>g task should be analysed to determ<strong>in</strong>e the most effective and<br />

safe method for its performance. Some considerations are as follows:<br />

(a) equipment should be simple to operate, decontam<strong>in</strong>ate and ma<strong>in</strong>ta<strong>in</strong>;<br />

(b) effective methods for controll<strong>in</strong>g airborne radionuclides should be<br />

implemented;<br />

(c) there should be effective control of discharges to the environment;<br />

(d) when underwater dismantl<strong>in</strong>g and cutt<strong>in</strong>g is used, provision should be made for<br />

water process<strong>in</strong>g to ensure good visibility and assist <strong>in</strong> effluent treatment;<br />

(e) the effect of each task on adjacent systems and structures and on other work <strong>in</strong><br />

progress should be evaluated; and<br />

(f) waste conta<strong>in</strong>ers, handl<strong>in</strong>g systems and routes should be def<strong>in</strong>ed before the start<br />

of dismantl<strong>in</strong>g work.<br />

≫ MAINTENANCE ≫<br />

Ma<strong>in</strong>tenance may be important dur<strong>in</strong>g deferred decommission<strong>in</strong>g s<strong>in</strong>ce part of the safety<br />

of the <strong>in</strong>stallation may rely on systems that have to reta<strong>in</strong> their capability to perform for<br />

extended periods of time. Periodical monitor<strong>in</strong>g of all the safety related components of<br />

the <strong>in</strong>stallation should be <strong>in</strong>corporated <strong>in</strong>to the<br />

decommission<strong>in</strong>g plan.<br />

≫ FINAL RADIOLOGICAL SURVEY ≫<br />

At the completion of the decontam<strong>in</strong>ation or dismantl<strong>in</strong>g activities, a survey of<br />

the residual radionuclides at the reactor site should be performed to demonstrate that the<br />

residual activity complies with the criteria set by the national regulatory authority and the<br />

decommission<strong>in</strong>g objectives have been fulfilled. This survey may be carried out <strong>in</strong><br />

phases, as decommission<strong>in</strong>g work is completed, to enable parts of the site to be released<br />

❙ 998 ❙

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!