04.02.2013 Views

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

failure of which might put <strong>in</strong> jeopardy systems mentioned above.<br />

❙ 769 ❙<br />

12. Surveillance Programmes<br />

Components subjected to <strong>in</strong>‐service <strong>in</strong>spection are exam<strong>in</strong>ed by visual, surface and<br />

volumetric methods as a general rule. In addition, the pressure‐reta<strong>in</strong><strong>in</strong>g components are<br />

checked by a leak test to ascerta<strong>in</strong> possible leakage.<br />

Consistent with their importance to safety, some components may be exempted from the<br />

surface and volumetric exam<strong>in</strong>ations, either because of their size, the size of their<br />

connections, or the number of barriers between the component and the fuel or the outside<br />

atmosphere. In such cases, however, these components are not exempt from exam<strong>in</strong>ations<br />

for evidence of <strong>in</strong>tegrity as part of the system hydraulic tests.<br />

The number, frequency and extent of <strong>in</strong>‐service <strong>in</strong>spections of similar systems and<br />

components may be reduced by a sampl<strong>in</strong>g programme that will vary accord<strong>in</strong>g to the<br />

design, the number of similar components or systems <strong>in</strong>volved, operational requirements,<br />

or the existence of identical units <strong>in</strong> a multiple unit plant. The sampl<strong>in</strong>g rate is consistent<br />

with the importance to safety of the component and the rate of degradation.<br />

12.3.3. Inspection schedule<br />

The <strong>in</strong>‐service <strong>in</strong>spection programme of a particular nuclear power plant is completed<br />

dur<strong>in</strong>g an <strong>in</strong>terval, the length of which is chosen with a conservative assumption to ensure<br />

that deterioration, if any, of the most exposed component is detected before it can lead to<br />

failure. The exam<strong>in</strong>ation schedule provides for repetition of the <strong>in</strong>spection programme<br />

dur<strong>in</strong>g the operat<strong>in</strong>g life of the nuclear power plant. The exam<strong>in</strong>ation programme may<br />

<strong>in</strong>volve evenly distributed <strong>in</strong>spection <strong>in</strong>tervals or alternatively, the <strong>in</strong>spection <strong>in</strong>tervals<br />

may be varied dur<strong>in</strong>g the operat<strong>in</strong>g life of the plant to improve the correlation between

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!