04.02.2013 Views

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

❙ 1039 ❙<br />

20. Waste Management<br />

characteristics of waste packages. For the demonstration of compliance with the waste<br />

acceptance requirements, a waste package qualification program should be established by<br />

the waste generator.<br />

Usually a LILW disposal facility, and sometimes even an <strong>in</strong>terim storage for LILW, is<br />

operated by a specialized organization, for <strong>in</strong>stance, a national waste management<br />

agency. The responsibilities of the various parties: waste generator, operator of the<br />

storage or repository, and regulator, are illustrated <strong>in</strong> figure 20.2. Sometimes the waste<br />

generator is also the operator of an <strong>in</strong>terim storage or a disposal facility. In that case, the<br />

regulator should bear the review and <strong>in</strong>spection responsibilities designated for the<br />

operator <strong>in</strong> figure 20.2.<br />

FIG. 20.2. The responsibility of various parties <strong>in</strong> waste management. Broken l<strong>in</strong>es <strong>in</strong>dicate<br />

review/ <strong>in</strong>spection duties.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!