<strong>Regional</strong> <strong>Basic</strong> <strong>Professional</strong> <strong>Tra<strong>in</strong><strong>in</strong>g</strong> <strong>Course</strong> (BPTC) on Nuclear Safety<br />

<strong>in</strong>spection <strong>in</strong>tervals and the probabilities and characteristics of component failures. The<br />

<strong>in</strong>spection <strong>in</strong>terval for the evenly distributed programme may be chosen to be from a few<br />

years to about ten years; <strong>in</strong> the variably distributed schedule these <strong>in</strong>tervals may be<br />

shorter <strong>in</strong> the early years of the plant life and then lengthened as experience permits.<br />

Whichever programme is adopted, however, <strong>in</strong>formation on flaw changes may require a<br />

shorten<strong>in</strong>g of the <strong>in</strong>terval towards the end of plant life.<br />

The <strong>in</strong>spection <strong>in</strong>terval is subdivided <strong>in</strong>to <strong>in</strong>spection periods <strong>in</strong> the course of which a<br />

required number of exam<strong>in</strong>ations should be completed, depend<strong>in</strong>g upon the component,<br />

the type of exam<strong>in</strong>ation, or the accessibility allowed by the normal plant operations or by<br />

scheduled outages. These exam<strong>in</strong>ations may be considered as a portion of the total<br />

<strong>in</strong>spection required for the whole <strong>in</strong>terval.<br />

Exam<strong>in</strong>ations which require the disassembly of components (such as disassembly of<br />

pumps or valves to exam<strong>in</strong>e large bolt<strong>in</strong>g volumetrically) or the removal of fuel or of<br />

core support structures <strong>in</strong> reactor vessels to exam<strong>in</strong>e welds or nozzle radius sections, may<br />

be deferred until the end of each <strong>in</strong>spection <strong>in</strong>terval except where, on the basis of results<br />

of exam<strong>in</strong>ation conducted on analogous components, an earlier <strong>in</strong>spection is necessary.<br />

This <strong>in</strong> no way dim<strong>in</strong>ishes the requirements on the exam<strong>in</strong>ation frequencies formulated <strong>in</strong><br />

the appropriate design codes (for example ASME, KEPIC etc.).<br />

12.3.4. Test requirement<br />

Pressure‐reta<strong>in</strong><strong>in</strong>g systems and components are subjected to:<br />

A system leakage and hydrostatic pressure test as part of the pre‐service <strong>in</strong>spection;<br />

A system leakage test, undertaken before resum<strong>in</strong>g operation, follow<strong>in</strong>g each<br />