❙ 1171 ❙<br />

Introduction Of e‐FAST and Exercise<br />

rapidly due to the reactor trip. The SBCS (Steam Bypass Control System) operates<br />

automatically to control the ma<strong>in</strong> steam pressure. As a result, the pressure of steam<br />

generator is ma<strong>in</strong>ta<strong>in</strong>ed as the pressure of Hot‐standby operational mode and is higher<br />

than that of steam generator <strong>in</strong> full power.<br />

4) Operational Strategy for SGTR<br />

First, operator should cool down the RCS us<strong>in</strong>g both steam generators(defected & sound)<br />

until RCS hot leg temperature becomes less than 550℉(287.8℃). Before isolat<strong>in</strong>g the<br />

defected steam generator, the <strong>in</strong>itial cool<strong>in</strong>g is necessary to reduce the possibility of<br />

MSSV(Ma<strong>in</strong> Steam Safety Valve) open.<br />

Second, the defected steam generator should be found & isolated to stop the release of<br />

radioactive materials from the defected steam generator to the secondary system & the<br />

environment.<br />

Third, the pressure difference between the RCS & the isolated steam generator should be<br />

ma<strong>in</strong>ta<strong>in</strong>ed to keep with<strong>in</strong> the range of ±50 psid(±3.5kg/cm2) to reduce & control the<br />

leak rate from RCS to steam generator.<br />

Fourth, the forced circulation or natural circulation cool<strong>in</strong>g should be used for the<br />

cooldown of RCS before the connection of shutdown cool<strong>in</strong>g system. In this case, the<br />

sound steam generator should be used for decay heat removal. The defected steam<br />

generator shall be depressurized or cooled down accord<strong>in</strong>g to the RCS condition.<br />

5) Steam Generator Tube Rupture (SGTR) Exercise<br />

(Malfunction 20.1)<br />

At 100% reactor power, carry out the exercise to control the plant <strong>in</strong> a stable state after<br />

SGTR accident as follow<strong>in</strong>g procedure;