<strong>Regional</strong> <strong>Basic</strong> <strong>Professional</strong> <strong>Tra<strong>in</strong><strong>in</strong>g</strong> <strong>Course</strong> (BPTC) on Nuclear Safety<br />

eddy current test<strong>in</strong>g (ECT) for steam generator tubes. The test specimen for UT<br />

performance demonstration shall be selected among those represent<strong>in</strong>g characteristics of<br />

size, materials, configuration, etc. of safety related facilities of domestic PWR and<br />

PHWR. In case of ECT for steam generator tubes, the performance demonstration shall<br />

be supplemented for each nuclear power plant by us<strong>in</strong>g data of characteristics of the<br />

plant.<br />

Personnel qualified <strong>in</strong> accordance with performance demonstration shall be re‐qualified<br />

every 5 years. Provided, that re‐qualification for UT performance demonstration is<br />

required only once.<br />

The licensee may apply the other standards or guidel<strong>in</strong>es equivalent to those def<strong>in</strong>ed <strong>in</strong><br />

the Notice or utilize the new methods or procedures appropriate for the <strong>in</strong>‐service<br />

<strong>in</strong>spection (alternative application), and also, he may request relief or exemption from<br />

any part of the standards (relief request), <strong>in</strong> one of the follow<strong>in</strong>g cases not reduc<strong>in</strong>g<br />

reliability of nuclear reactor facilities and <strong>in</strong>tegrity of related facilities:<br />

In case that the <strong>in</strong>spection can neither be conducted nor meet the standards due to<br />

characteristics of design, configuration and materials of the components or systems<br />

subject to exam<strong>in</strong>ation or test;<br />

In case that the workers are anticipated to be over‐exposed to high radiation <strong>in</strong> spite<br />

of considerable protective action taken;<br />

In case that alternative application or relief request does not reduce appropriate<br />

quality and safety; or<br />

In case that quality and safety improvement to be achieved by the <strong>in</strong>spection<br />

accord<strong>in</strong>g to the standards of Article 6 do not compensate for the difficulty and risk<br />

of the work<strong>in</strong>g activity.<br />