04.02.2013 Views

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

commission<strong>in</strong>g process.<br />

❙ 869 ❙<br />

15. Operational Safety<br />

To confirm the applicability and quality of the operat<strong>in</strong>g procedures, they are verified to<br />

ensure their technical accuracy, and are validated to ensure their usability with the<br />

<strong>in</strong>stalled equipment and controls as far as possible prior to load<strong>in</strong>g fuel <strong>in</strong>to the core. This<br />

process cont<strong>in</strong>ues dur<strong>in</strong>g the commission<strong>in</strong>g phase. This prelim<strong>in</strong>ary verification and<br />

validation process also applies to ma<strong>in</strong>tenance, surveillance and chemistry procedures, as<br />

appropriate.<br />

The operat<strong>in</strong>g organization ensures that the commission<strong>in</strong>g program <strong>in</strong>cludes all the tests<br />

necessary to demonstrate that the plant as <strong>in</strong>stalled meets the requirements of the FSAR,<br />

satisfies the design <strong>in</strong>tent, and consequently can be operable <strong>in</strong> accordance with the<br />

LCOs. The tests are carried out <strong>in</strong> a logical order. Tests that may place the plant <strong>in</strong> a<br />

condition that has not been analyzed shall not be performed. The program ensures that<br />

system and component “base l<strong>in</strong>e” data, important to safety of the plant and for<br />

subsequent safety reviews, is collected and reta<strong>in</strong>ed.<br />

From the start of commission<strong>in</strong>g, adequate work control and modification procedures are<br />

implemented to ensure that the commission<strong>in</strong>g tests are not <strong>in</strong>validated by subsequent<br />

<strong>in</strong>tervention on the plant. These procedures are the same as those <strong>in</strong>tended for the<br />

operat<strong>in</strong>g phase.<br />

From construction to commission<strong>in</strong>g, and f<strong>in</strong>ally to operation, the plant is adequately<br />

monitored and ma<strong>in</strong>ta<strong>in</strong>ed <strong>in</strong> order to protect the equipment, support the test<strong>in</strong>g phase and<br />

cont<strong>in</strong>ue to satisfy the SAR. Records of operations and ma<strong>in</strong>tenance are produced from<br />

the <strong>in</strong>itial energiz<strong>in</strong>g and operation of each plant system, and are reta<strong>in</strong>ed by the<br />

operat<strong>in</strong>g organization <strong>in</strong> proper archive facilities for periods as agreed with the<br />

regulatory body.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!