04.02.2013 Views

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Regional</strong> <strong>Basic</strong> <strong>Professional</strong> <strong>Tra<strong>in</strong><strong>in</strong>g</strong> <strong>Course</strong> (BPTC) on Nuclear Safety<br />

guidel<strong>in</strong>es. The procedures shall <strong>in</strong>clude management commitment and programs<br />

to ma<strong>in</strong>ta<strong>in</strong> exposures and releases as low as reasonably achievable <strong>in</strong><br />

accordance with the guidel<strong>in</strong>es;<br />

(6) adm<strong>in</strong>istrative controls for operations and ma<strong>in</strong>tenance and for the conduct of<br />

irradiations and experiments that could affect reactor safety or core reactivity;<br />

(7) implementation of required plans such as emergency or security plans;<br />

(8) use, receipt, and transfer of by‐product material, if appropriate.<br />

10.10.5. Experiments Review and Approval<br />

Approved experiments shall be carried out <strong>in</strong> accordance with established and approved<br />

procedures. The follow<strong>in</strong>g provisions shall be stated:<br />

(1) All new experiments or class of experiments shall be reviewed by the review<br />

group and approved <strong>in</strong> writ<strong>in</strong>g by Level 2 (Senior Reactor Operators) or<br />

designated alternates prior to <strong>in</strong>itiation;<br />

(2) Substantive changes to previously approved experiments shall be made only after<br />

review by the review group and approved <strong>in</strong> writ<strong>in</strong>g by Level 2 (Senior Reactor<br />

Operators) or designated alternates. M<strong>in</strong>or changes that do not significantly alter<br />

the experiment may be approved by Level 3 (Reactor Operators) or higher.<br />

10.10.6. Required Actions<br />

10.10.6.1. Action to be taken <strong>in</strong> case of safety limits violation<br />

(1) The reactor shall be shut down, and reactor operations shall not be resumed until<br />

❙ 692 ❙

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!