04.02.2013 Views

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Regional</strong> <strong>Basic</strong> <strong>Professional</strong> <strong>Tra<strong>in</strong><strong>in</strong>g</strong> <strong>Course</strong> (BPTC) on Nuclear Safety<br />

⑦ Tables and Figures<br />

and shows many differences <strong>in</strong> format compared to US type operational technical<br />

specifications. Also, its operation modes are classified <strong>in</strong>to 9 modes, which are shown <strong>in</strong><br />

Table 10.2; however, the operation modes consist of mostly the same items <strong>in</strong>cluded <strong>in</strong><br />

the US standard technical specifications.<br />

Mode<br />

Number<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

Designation of<br />

standard<br />

operat<strong>in</strong>g mode<br />

Refuel<strong>in</strong>g Cold<br />

Shutdown<br />

Ma<strong>in</strong>tenance<br />

Cold Shutdown<br />

(RCS open)<br />

Normal Cold<br />

Shutdown<br />

Monophasic<br />

Inter Shutdown<br />

with RRA<br />

Biphasic Inter<br />

Shutdown<br />

conditional RRA<br />

Normal Inter<br />

Shutdown<br />

without RRA<br />

Hot shutdown<br />

P = 0<br />

Hot standby<br />

P ≤ 2% RP<br />

Power operation<br />

2%RP≤P≤RP<br />

Table 10.2 Operational Modes of Ulj<strong>in</strong> No.1and No.2 NPP<br />

Core criticality<br />

deviation<br />

Neutron characteristics<br />

Shutdown and Control rod<br />

bank position<br />

≥ 5000pcm All bank <strong>in</strong>serted<br />

≥ 5000pcm All bank <strong>in</strong>serted<br />

≥ 1000pcm<br />

≥ 1000pcm<br />

≥ 1000pcm<br />

≥ 1000pcm<br />

≥ 1000pcm<br />

and...<br />

0<br />

0<br />

SA, SB and B banks at<br />

least are withdrawn except<br />

LCO 16.4.3.1<br />

SA, SB and B banks at<br />

least are withdrawn<br />

SA, SB and B banks at<br />

least are withdrawn<br />

SA, SB and B banks at<br />

least are withdrawn<br />

SA and SB are withdrawn<br />

SA and SB are withdrawn<br />

and CBs are above<br />

<strong>in</strong>sertion limit<br />

SA and SB are withdrawn<br />

and CBs are above<br />

<strong>in</strong>sertion limit<br />

❙ 654 ❙<br />

Reactor coolant system<br />

pressure/temperature<br />

10℃≤ T ≤60℃<br />

atmospheric pressure<br />

10℃≤ T ≤70℃<br />

atmospheric pressure<br />

10℃≤ T ≤90℃<br />

1 ≤ P ≤ 28 bars<br />

RCV pressure control<br />

(if applicable)<br />

90℃≤ T ≤177℃<br />

24 ≤ P ≤ 28 bars<br />

RCV pressure control<br />

120℃≤ T ≤177℃<br />

24 ≤ P ≤ 28 bars<br />

PZR pressure control<br />

P/T parameter is <strong>in</strong> area 6<br />

<strong>in</strong> Fig F‐16‐1.<br />

PZR pressure control<br />

Tavg = 286℃(+3,‐2)<br />

P=155 bars<br />

PZR pressure control<br />

Same as Mode 7<br />

286℃≤Tavg≤304.6℃<br />

P=155 bars<br />

PZR pressure control

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!