04.02.2013 Views

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

Regional Basic Professional Training Course in Korea

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Regional</strong> <strong>Basic</strong> <strong>Professional</strong> <strong>Tra<strong>in</strong><strong>in</strong>g</strong> <strong>Course</strong> (BPTC) on Nuclear Safety<br />

of auditors; Qualification of lead auditors; Proficiency ma<strong>in</strong>tenance and re‐qualification;<br />

Adm<strong>in</strong>istration; Records.<br />

Supplement 2S‐4: Requirements for Personnel Indoctr<strong>in</strong>ation and <strong>Tra<strong>in</strong><strong>in</strong>g</strong>: Applicability;<br />

Indoctr<strong>in</strong>ation; <strong>Tra<strong>in</strong><strong>in</strong>g</strong>; and Records<br />

Appendix 2A‐1: Non‐mandatory guidance on qualification of <strong>in</strong>spection and test<br />

personnel: Function qualifications: Level Ⅰ, Ⅱ, Ⅲ; Education; Experience<br />

Appendix 2A‐2: Non‐mandatory guidance on quality assurance programs: Program<br />

format; Program development; Process requirements and performance; Work process:<br />

Process control; <strong>Tra<strong>in</strong><strong>in</strong>g</strong> and qualification; and Assessment of performance.<br />

<strong>Basic</strong> Requirement 3 ‐ Design Control: The design shall be def<strong>in</strong>ed, controlled, and<br />

verified. Applicable design <strong>in</strong>puts shall be appropriately specified on a timely basis and<br />

correctly reflected to design documents. Design <strong>in</strong>terfaces shall be identified and<br />

controlled. Design adequacy shall be verified by persons other than those who performed<br />

design. Design changes, <strong>in</strong>clud<strong>in</strong>g field changes, shall be controlled by measures<br />

commensurate with those applied to the orig<strong>in</strong>al design<br />

Supplement 3S‐1: Design Input; Design Process‐ Design analyses, Design verification;<br />

Extent; and methods of design reviews, alternate calculations, and qualification tests;<br />

Change control; Interface control; and Documentation and record<br />

Appendix 3A‐1: Non‐mandatory Guidance on Design Control: Design <strong>in</strong>put; Design<br />

process; Design analysis; Design verification; Change control; Interface control; and<br />

Documentation and record<strong>in</strong>g.<br />

<strong>Basic</strong> Requirement 4 ‐ Procurement Document Control: Applicable design bases and<br />

❙ 442 ❙

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!