30.01.2013 Views

DCP Series Telcon Message Manual - Public Support Login - Unisys

DCP Series Telcon Message Manual - Public Support Login - Unisys

DCP Series Telcon Message Manual - Public Support Login - Unisys

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ILMX25 Port Initialization Failure ILMX25<br />

Event 11 ILM EVENT<br />

Description: During X.25 initialization, PDNILM received an undeliverable message<br />

(UDM) attach confirm packet with a failure status from the ILM Platform. A related<br />

UDM attachment error CENLOG should be reported by the ILM Platform or ILM IA to<br />

indicate the specific reason for the failure.<br />

Attributes affected: Line event including port number and line name,<br />

supplementary text message. Procedure line_init_request of the X.25 PSCS program<br />

product generates this CENLOG.<br />

Action: Refer to any other “UDM attachment error” CENLOGs related to this one for<br />

determining the reason for the error. If no other CENLOGs occurred, this may<br />

indicate a software error. Contact your <strong>Unisys</strong> support representative.<br />

ILMX25 Received SAI Down from the ILM Platform<br />

Description: PDNILM receceived an SAI down facility control request packet from<br />

the ILM Platform after the Platform was notified of a PP State Item. PDNILM<br />

proceeds to de-allocate resources (line control block) associated with the line.<br />

Attributes affected: Line event including port number, supplementary text message.<br />

Procedure line_init_request PDN8ILM of the X.25 PSCS program product generates<br />

this CENLOG.<br />

Action: The aborted port should automatically restart and the line should become<br />

reinitialized. No action needed.<br />

If the NMS ILM DUMP command was previously used to automatically retrieve the<br />

aborted port’s memory into a <strong>DCP</strong> file, contact your <strong>Unisys</strong> support representative to<br />

have the ILM DUMP analyzed.<br />

ILMX25 State Item Detach Request Confirm<br />

Description: The PDNILM module received an unsolicited detach request confirm<br />

packet from the ILM Platform after the Platform was notified of a PP State item. The<br />

ILM Platform uses this unsolicited packet method to indicate that a PP state item<br />

occured. PDNILM proceeds to detach queue resources associated with the line.<br />

Attributes affected: Line event includs the port number and supplementary text<br />

message. Procedure PDN5ILM of the X.25 PSCS program product generates this<br />

CENLOG.<br />

Action: The aborted port should automatically restart and the line should become<br />

reinitialized; no action necessary.<br />

If the NMS ILM DUMP command was previously used to automatically retrieve the<br />

aborted port’s memory into a <strong>DCP</strong> file, contact your <strong>Unisys</strong> support representative to<br />

have the ILM DUMP analyzed.<br />

7436 0728–303 6–69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!