12.07.2015 Views

Configuration Handbook - Kamami.pl

Configuration Handbook - Kamami.pl

Configuration Handbook - Kamami.pl

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Configuring Cyclone II DevicesFigure 13–9. Single Device PS <strong>Configuration</strong> Using an External HostMemoryADDRDATA0V CC . (1)V CC . (1)V CC10 kΩ 10 kΩCyclone II DeviceCONF_DONEnSTATUSnCEMSEL0MSEL1External Host(MAX II Device orMicroprocessor)GNDDATA0nCONFIGGNDnCEO N.C. (2)DCLKNotes to Figure 13–9:(1) Connect the pull-up resistor to a sup<strong>pl</strong>y that provides an acceptable input signal for the device. V CC should be highenough to meet the VIH specification of the I/O on the device and the external host.(2) The nCEO pin can be left unconnected or used as a user I/O pin when it does not feed other device’s nCE pin.Upon power-up, the Cyclone II device goes through a POR, which lastsapproximately 100 ms. During POR, the device resets, holds nSTATUSlow, and tri-states all user I/O pins. Once the FPGA successfully exitsPOR, all user I/O pins continue to be tri-stated.fThe value of the weak pull-up resistors on the I/O pins that are onbefore and during configuration can be found in the Cyclone II Device<strong>Handbook</strong>.The configuration cycle consists of three stages: reset, configuration, andinitialization.Reset StageWhile the Cyclone II device’s nCONFIG or nSTATUS pins are low, thedevice is in reset. To initiate configuration, the MAX II device musttransition the Cyclone II nCONFIG pin from low to high.1 V CCINT and V CCIO of the banks where the configuration andJTAG pins reside need to be fully powered to the appropriatevoltage levels in order to begin the configuration process.When the Cyclone II nCONFIG pin transitions high, the Cyclone II devicecomes out of reset and releases the open-drain nSTATUS pin, which isthen pulled high by an external 10-kΩ pull-up resistor. Once nSTATUS isreleased, the FPGA is ready to receive configuration data and the MAX IIdevice can start the configuration at any time.Altera Corporation 13–23February 2007 Cyclone II Device <strong>Handbook</strong>, Volume 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!