SECTION 00100 - INSTRUCTIONS TO BIDDERS<br />

1.01 SECURING CONTRACT DOCUMENTS<br />

A. Drawings, specifications and other contract documents may be obtained at the office of the<br />

Contractor by complying with the conditions as stipulated in the “Notice to Subcontractors.”<br />

1.02 PROPOSALS<br />

A. Before submitting a proposal, each bidder shall carefully examine the drawings,<br />

specifications and other contract documents, shall visit the site of work, shall fully inform<br />

himself/herself as to all existing conditions and limitations, and shall include in the proposal<br />

the cost of all items included in the contract.<br />

B. It shall be the responsibility of the bidder to see that his/her proposal is received on or before<br />

the closing time indicated in the “Notice to Subcontractors.” Any proposal received after the<br />

scheduled closing time for receipt of bids shall be returned to the bidder.<br />

C. Each bidder shall inform himself/herself fully of the conditions relating to construction of the<br />

project and the employment of labor thereon. Failure to do so will not relieve a successful<br />

bidder of the obligation to furnish all material and labor necessary to carry out the provisions<br />

of the Contract.<br />

1.03 SCOPE OF WORK<br />

A. The Work consists of the furnishing of all labor, materials, services, equipment and<br />

appliances required for the fabrication, delivery and erection of all items of work.<br />

1.04 WITHDRAWAL OF BID<br />

A. Bids may be withdrawn by the bidder either personally or by written request prior to, but not<br />

after, the time fixed for opening the bids. Bids submitted and opened may not be withdrawn,<br />

and must remain fixed and in force as submitted for a period of forty-five (45) days after the<br />

date for opening the bids.<br />

1.05 INTERPRETATION OF DRAWINGS AND DOCUMENTS<br />

A. If any person contemplating submitting a bid for the proposed Contract is in doubt as to the<br />

true meaning of any part of the drawings, specifications or other proposed Contract<br />

Documents, he/she may submit to the Architect, a written request for an interpretation or<br />

corrections thereof. The person submitting the request will be responsible for its prompt<br />

delivery. Any interpretation or correction of the proposed Documents will be made only by<br />

Addendum duly issued, and a copy of such Addendum will be mailed or delivered to each<br />

person receiving a set of such Documents. The Owner will not be responsible for any oral<br />

instructions of the proposals received other than items which are included in addenda,<br />

additional written instructions or subsequent written change orders.<br />

1. Written requests may be faxed or emailed to SL&A Architects:<br />

a. Fax: (801) 322-5557<br />

b. Email: rfisher@slaarch.com<br />

B. It is the responsibility of each bidder to ascertain that he/she is in possession of a complete<br />

set of Contract Documents by comparing page numbers against indexes. Before submitting<br />

bids, the subcontractor may wish to check with the CMGC or Architect to determine the<br />

status of any addenda or additional instructions. No post-bidding claims of incomplete sets of<br />

drawings, specifications, addenda, etc. will be considered.<br />

C. Should discrepancies appear in the drawings or specifications which are not clarified<br />

or altered by the addenda, then it will be assumed that the subcontractor has bid the<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

INSTRUCTIONS TO BIDDERS 00100 - 1