10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

shall turn over to the Owner this compilation of catalog data. A double index shall be provided, one giving an<br />

alphabetical list of products for which catalogs are included, and one giving their addresses, whose products are<br />

included in the work. Provide data for each item of equipment listed in SCHEDULES, MATERIALS &<br />

EQUIPMENT, as shown in Section 15010. Provide copy of submittal data. Four (4) copies shall be delivered to<br />

the Owner's representative for his approval.<br />

Provide warranty schedule and schedule of overload protection as required in Section 15030.<br />

Binders shall be white vinyl with see-thru front and end of panels identified as follows:<br />

SEGO LILY ELEMENTARY SCHOOL<br />

CLASSROOM ADDITION<br />

2009<br />

OPERATING & MAINTENANCE MANUAL<br />

SET #<br />

PART 2.00 - PRODUCTS<br />

MATERIALS, EQUIPMENT AND ACCESSORIES:<br />

Unless otherwise specified, all equipment, accessories, and materials shall be new and undamaged, and the<br />

workmanship shall be of the best quality for the use intended and shall be acceptable to the Owner's<br />

Representative.<br />

Equipment, accessories, and materials shall be essentially the standard products of the manufacturer, or as<br />

specified herein. Where two or more units of the same class of new equipment are required, these units shall be<br />

products of a single manufacturer.<br />

Should mechanical equipment other than that used in the design be furnished, it shall be the responsibility of the<br />

mechanical subcontractor to provide large scale (1/2"=1'-0") installation drawings, as required, showing service<br />

and maintenance points with proper clearance allowances for service.<br />

All equipment shall be selected to deliver full rated capacity at the job site elevation.<br />

PART 3.00 - EXECUTION<br />

FUNCTIONING AND OPERATION OF EQUIPMENT:<br />

Contractor's Responsibility:<br />

Installation and startup shall be so made that its several component parts will function together as a workable<br />

system, and shall be left with all equipment properly adjusted and in working order.<br />

CLEANING AND PATCHING BY MECHANICAL CONTRACTOR:<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

GENERAL PROVISIONS 15010-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!