that the various mechanical system components are coordinated with each other, and with other building<br />

systems.<br />

The coordination drawings shall be drawn to scale (usually 1/2" = 1'-0") and shall show all systems as they relate<br />

to each other, especially in areas of potential conflict.<br />

Equipment layout drawings shall identify service and maintenance points, aisleways and accessways, electrical<br />

lights and panels, control panels, and shall show necessary maintenance clearances.<br />

All ductwork and piping and their attachments to the building structure shall be detailed, and shall be coordinated<br />

with the Owner's representative.<br />

COOPERATION WITH OTHERS:<br />

The contractor shall so organize the work that progress will harmonize with the work of all trades, so that all work<br />

may proceed as expeditiously as possible. The contractor shall be held responsible for any delays which might<br />

be caused by his negligence or failure to cooperate with other contractors or crafts.<br />

FOREMAN:<br />

A full-time foreman shall be designated by the contractor to the Owner's representative and shall be available on<br />

site for consultation. This individual, when appointed, will not be replaced without prior approval from the<br />

Owner's representative. The foreman shall be responsible for the coordination and correct placing of the work.<br />

GUARANTEE:<br />

By the acceptance of the contract award for the work herein described, the contractor assumes the full<br />

responsibility imposed by the guarantee as set forth herein and should protect himself through proper guarantee<br />

from equipment and specialty manufacturers and subcontractors as their interests may appear.<br />

All materials and equipment provided and installed under this division of the specifications shall be guaranteed<br />

for a period of one (1) year from the date of substantial completion and acceptance by the Owner, and all<br />

refrigerant compressors shall be guaranteed for five (5) years from the date of substantial completion and<br />

acceptance, unless specifically noted elsewhere in the specification. Should any trouble develop during this<br />

period due to defective materials or workmanship, the contractor agrees to correct the trouble without any cost to<br />

the Owner, any defect noticed at the time of installation and/or during the guarantee period shall be corrected<br />

immediately to the satisfaction of the Owner.<br />

SCHEDULES, MATERIALS AND EQUIPMENT:<br />

As soon as practicable, and within 30 days after date of award of contract, and before commencement of work, a<br />

complete schedule of equipment and materials proposed for installation shall be submitted to the Owner's<br />

representative. The schedule shall include catalogs, cuts, drawings, and such other descriptive data or samples<br />

that are requested by the Owner's representative. Schedules shall include all items of equipment used. No<br />

partial submittals will be accepted.<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

GENERAL PROVISIONS 15010-6