10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.03 FABRICATION<br />

5. Lifting Mechanism: Crashproof steel cordlocks with corrosion-resistant finish, steel<br />

locking dogs, hexagon pulley, polyester 2.2mm lift cords, and Break-Thru® safety<br />

tassel. Located on either side of individual blind unit as per architect’s request.<br />

6. Tilting Mechanism: Cord tilter consisting of zinc die-cast helical gear type driven by a<br />

worm in enclosed polymer housing, 2.2mm polyester cord, and solid steel corrosion<br />

resistant tilt rod.<br />

7. Tilt Control Cord: 2.2mm polyester cord. Located on either side of individual blind unit<br />

as per architect’s request.<br />

8. Mounting Hardware: Manufacturer’s standard .030” steel box brackets with baked-on<br />

polyester finish to match headrail with additional support brackets for blinds over 84”<br />

wide.<br />

9. Options: Provide blinds with the valance option.<br />

A. Measurements shall be accurate to within + 1/8” or as recommended in writing by<br />

manufacturer.<br />

2.04 FINISHES<br />

A. Slat Finish: To be selected by Architect from manufacturer’s standard colors.<br />

PART 3 - EXECUTION<br />

3.01 INSPECTION<br />

A. Subcontractor shall be responsible for inspection on site, approval of mounting surfaces,<br />

installation conditions and field measurement for this work.<br />

B. Other interacting trades shall receive drawings of shade systems, dimensions, assembly and<br />

installation methods from subcontractor upon request.<br />

3.02 INSTALLATION<br />

A. Installation shall comply with manufacturer’s specifications, standards and procedures as<br />

detailed on contract drawings.<br />

B. Adequate Clearance shall be provided to permit unencumbered operation of shade and<br />

hardware.<br />

C. Clean finish installation of dirt and finger marks. Leave work area clean and free of debris.<br />

3.03 SCHEDULE:<br />

A. Exterior Windows: Provide one blind on each exterior wall window in the addition.<br />

B. Interior Lites: Provide blinds in each lite of door side lites. Mount inside the jamb.<br />

END OF SECTION<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION MARCH 2, 2009<br />

2” HORIZONTAL ALUMINUM BLINDS 12492 - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!