10.04.2013 Views

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

Complete Compiled Specification.pdf - Peck Ormsby Construction

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

epresentative for approval prior to ordering. Any work done without this approval is done at the contractor's risk.<br />

Charts of all valves shall be furnished to the Owner's representative by the contractor.<br />

A chart to be mounted in a frame with clear glass front, and secured on the wall in the main Mechanical<br />

Equipment Room.<br />

Second chart shall be prepared for use outside of the equipment room, and to be provided with an approved<br />

heavy transparent plastic closure for permanent protection. Two (2) holes to be punched at top of plastic closure<br />

to allow for affixing approximately an 8" length of nickel plated bead chain. Each hole to be reinforced by means<br />

of a small brass or nickel grommet. Plastic closure shall be as manufactured by Seton Name Plate Company,<br />

New Haven, Conn., or approved equal.<br />

Identify all valves. A sample identification shall be as follows:<br />

______________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDTION March 2, 2009<br />

BASIC MATERIALS & METHODS 15050-22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!