SECTION 15010 - GENERAL PROVISIONS<br />

PART 1.00 - GENERAL<br />

GENERAL CONDITIONS:<br />

The contractor shall carefully read the General Conditions of the Contract and all information to bidders which,<br />

with the following specifications for heating, cooling, ventilating, plumbing, and temperature control are a part of<br />

the Contract.<br />

BASIC BID:<br />

Shall include all labor and materials specified in this division. The term "furnish" and/or "install" or similar<br />

implication shall mean "furnish and install complete."<br />

SCOPE OF WORK:<br />

The work to be done under this section includes the furnishing of all labor, materials, equipment, controls and<br />

accessories required to complete all air conditioning, plumbing, drainage, and other mechanical systems as<br />

shown on plans and/or described in these specifications, including miscellaneous items required to provide a<br />

complete and functional facility.<br />

Work shall include, but shall not be necessarily limited to, the following:<br />

1. Hot water heating systems<br />

2. Chilled water cooling system<br />

3. Air handling unit air distribution system<br />

4. System commissioning<br />

5. Testing<br />

6. Balancing<br />

7. Insulation systems<br />

8. Air distribution system<br />

9. Automatic control systems<br />

10. Plumbing systems<br />

11 Demolition of existing systems<br />

Unless otherwise noted the mechanical contractor shall provide all miscellaneous electrical work, including<br />

control conduit and wiring (both line voltage and low voltage) for all special systems where the wiring<br />

requirements are either noted on the drawings or provided by the equipment manufacturers or suppliers.<br />

Exception: Where the required wiring is clearly shown on the electrical drawings it shall be provided by the<br />

electrical contractor.<br />

CODES AND ORDINANCES:<br />

All work shall be installed in accordance with the city, state, and local codes, which govern the type of work<br />

_________________________________________________________________________________________<br />

SEGO LILY ELEMENTARY SCHOOL CLASSROOM ADDITION March 2, 2009<br />

GENERAL PROVISIONS 15010-1